Basalt
Upcoming
P & Z
The P&Z Commission will continue two public hearings on major developments. The first is a 93-key hotel with three deed-restricted housing units at 218 E. Valley Road (former Movieland). The second is a 64-unit residential project with 12 commercial lodging cabins at 431 Emma Road (Jadwin/Black Mountain).
- 93-key Residence Inn by Marriott hotel with 3 deed-restricted rental units at 218 E. Valley Road
- 64 residential dwelling units and 12 lodging cabins proposed at 431 Emma Road (Jadwin/Black Mountain)
- Annexation amendments and PUD modifications for both projects
- Site visit at 5:00 PM to the Movieland property
- Public comment periods for both hearings
BACH
The scheduled meeting for the Basalt Affordable Community Housing (BACH) committee on July 9, 2026, has been cancelled.
Last 30 days
BPAC
The Basalt Public Arts Commission is meeting to provide feedback on a draft Request for Proposals (RFP) for a permanent sculpture at the Willits Town Center roundabout. The commission will also review current grant awardees and sculpture consignment updates.
- Review of draft RFP for roundabout sculpture with a budget up to $100,000
- Overview of 2026 BPAC Grant awards to date
- Discussion of title plaques for sculptures consigned in Willits Town Center
- Planning for an interactive public art map
- Discussion of a mural at the BCC Building (The Midland Residences)
BACH
The Basalt Affordable Community Housing (BACH) meeting scheduled for Thursday, June 25, 2026, has been cancelled. The meeting was originally set to take place at the Basalt Planning Department on Midland Avenue.
POST
This meeting is canceled; no items will be discussed or decided.
Town Council
The Town Council will hold a work session on future funding for the Basalt Connect microtransit service, facing a $19,484 cost increase and reduced grants in 2027. The regular meeting includes consent items such as change orders for the Confluence Park Safe Routes to School project and continuing a public hearing for a 54-unit commercial storage and 47-residential-unit development at 555 Basalt Avenue. Council will also interview and appoint a member to the Parks, Open Space, Trails committee and conduct a first reading on vacating a waterline easement at 142 Swinging Bridge Lane.
- Change orders for Phase I of Confluence Park Safe Routes to School project
- Letter of support for Pitkin Broadband
- Continuation of public hearing for 555 Basalt Avenue development (54 storage units, 47 residential)
- First reading of ordinance to vacate waterline easement at 142 Swinging Bridge Lane
- Interviews for POST committee appointment
P & Z
The Planning and Zoning Commission will hold public hearings on four items. The main item is a proposal for a 94-key Residence Inn hotel with two deed-restricted rental units at 218 E. Valley Road. Other items include a PUD amendment for a disabled-accessible home remodel, a 64-unit residential and 12-cabin development at Jadwin/Black Mountain, and initial zoning for a town police/public works parcel. The Commission will take public comment and may continue items to July 7.
- 94-key Residence Inn by Marriott hotel with 2 deed-restricted rental units at 218 E. Valley Road
- PUD amendment to allow 5,474 sq ft total floor area for disability accommodation at 739 Hillcrest Drive
- 64 residential units and 12 commercial lodging cabins proposed at Jadwin/Black Mountain (431 Emma Road)
- Initial town zoning as P (Public) for police/public works parcel at 20526 Highway 82
P & Z
The Basalt Planning and Zoning Commission is holding a public hearing and initial discussion on the Jadwin/Black Mountain Development final plan. Staff will present the proposal for 64 residential units and 12 lodging cabins at 431 Emma Road, alongside a concurrent annexation request. The commission will evaluate the project’s consistency with the town’s master plan, affordable housing requirements, and trail improvements before continuing the hearing to a future date for draft conditions.
- Public hearing on Jadwin/Black Mountain PUD Final Plan at 431 Emma Road
- Proposal for 64 residential units and 12 commercial lodging cabins
- Concurrent annexation of approximately 9 acres near the Post Office
- Required improvements include Highway 82 traffic upgrades, trail connections, and childcare fees
- Hearing continued to a future date pending draft conditions