Capital Area Metropolitan Planning Organization public meetings in 2020
20 substantive meetings from 2020, with official agendas or minutes and plain-English summaries.
Executive Board
The NC Capital Area Metropolitan Planning Organization Executive Board will vote on several transportation planning documents, including the adoption of the Locally Preferred Alternative for the Wake Bus Rapid Transit Western Corridor. The board will also approve contracts for the Western Wake Traffic Signal System Integration Study and the US 401 Corridor Study. Additionally, the agenda includes amendments to the FY 2021 Unified Planning Work Program and the FY2020-2029 Transportation Improvement Program.
- Adoption of the Locally Preferred Alternative (LPA) for Wake Bus Rapid Transit: Western Corridor
- Approval of the contract and scope for the Western Wake Traffic Signal System Integration Study
- Approval of the contract and scope for the US 401 Corridor Study with WSP
- Adoption of Amendment #1 to the FY 21 Unified Planning Work Program
- Approval of Amendment #3 to the FY2020-2029 Transportation Improvement Program
The Executive Board approved several transportation planning amendments, including the locally preferred alternative for the Wake Bus Rapid Transit: Western Corridor. The board also authorized contracts for traffic signal and corridor studies and voted to cancel the December 2020 meeting.
- Approved 2045 Metropolitan Transportation Plan Amendment and Air Quality Conformity Report
- Adopted locally preferred alternative for Wake Bus Rapid Transit: Western Corridor
- Adopted Amendment #1 of the FY 21 Unified Planning Work Program
- Approved Amendment #3 to FY2020-2029 Transportation Improvement Program
- Approved FY 2021 Wake Transit Work Plan 1st quarter amendment request
- Approved contract for Western Wake Traffic Signal System Integration Study
- Approved contract for US 401 Corridor Study
- Canceled December 2020 board meeting
Technical Coordinating Committee
The NC Capital Area MPO Technical Coordinating Committee is meeting virtually to review transportation planning amendments. The primary action is to recommend the locally preferred alternative for the Wake Bus Rapid Transit Western Corridor to the Executive Board. The committee will also approve amendments to the 2045 Metropolitan Transportation Plan and the FY2020-2029 Transportation Improvement Program.
- Recommend adoption of the Locally Preferred Alternative for Wake Bus Rapid Transit: Western Corridor
- Approve Amendment to the 2045 Metropolitan Transportation Plan and Air Quality Conformity Determination
- Approve Amendment #3 to the FY2020-2029 Transportation Improvement Program
- Approve FY 2021 Wake Transit Work Plan 1st Quarter Amendment Request
- Adopt Amendment #1 of the FY 21 Unified Planning Work Program
The CAMPO Technical Coordinating Committee met remotely on November 5, 2020 and approved its October minutes. It voted unanimously to recommend several items to the Executive Board: an amendment to the 2045 Metropolitan Transportation Plan with an air quality conformity determination, the locally preferred alternative for the Wake Bus Rapid Transit Western Corridor, a $1.1 million FY 2021 Wake Transit Work Plan amendment, Amendment #1 to the FY 21 Unified Planning Work Program, and Amendment #3 to the FY2020-2029 Transportation Improvement Program. Several items were received only as information, including a funding update, the NCDOT NC-MOVES 2050 update, and budget and project reports.
- Approved October 2020 TCC meeting minutes (unanimous)
- Recommended approval of 2045 MTP amendment and Air Quality Conformity Determination to Executive Board (unanimous)
- Recommended approval of Wake BRT Western Corridor locally preferred alternative to Executive Board (unanimous)
- Recommended approval of FY 2021 Wake Transit Work Plan 1st quarter amendment, allocating $1.1M to GoTriangle, and authorization to sign project-level agreement (unanimous)
- Recommended approval of FY 21 Unified Planning Work Program Amendment #1 to Executive Board (unanimous)
- Recommended approval of Amendment #3 to FY2020-2029 Transportation Improvement Program to Executive Board (unanimous)
- Received CAMPO Projects and Programs Funding Update as information
- Received NCDOT NC-MOVES 2050 Update, Operating Budget, Member Shares, Project Updates, Public Engagement Updates, and Staff Reports as information
Executive Board
The NC Capital Area Metropolitan Planning Organization Executive Board meets virtually to approve consent items and conduct public hearings. Key decisions include approving Amendment #2 to the FY2020-2029 Transportation Improvement Program (TIP) and recommending approval of SPOT 6 alternate criteria. The board also holds a public hearing on the proposed locally preferred alternative for the Wake Bus Rapid Transit Western Corridor and Amendment #3 to the TIP.
- Approve Amendment #2 to the FY2020-2029 Transportation Improvement Program
- Recommend approval of SPOT 6 alternate criteria
- Public hearing on Wake Bus Rapid Transit: Western Corridor Locally Preferred Alternative
- Public hearing on Amendment #3 to FY2020-2029 Transportation Improvement Program
- Consider action on LAPP FFY2022 submittal policy
The Executive Board authorized staff to use discretion regarding fund swaps with NCDOT to restart local projects. The board also waived submittal limit rules for FY22 LAPP applications for projects delayed by NCDOT. Additionally, the board approved several consent agenda items including TIP Amendment #2.
- Approved September 2020 Meeting Minutes (Unanimous)
- Approved FY2020-2029 Transportation Improvement Program Amendment #2 (Unanimous)
- Recommended approval of SPOT 6 alternate criteria (Unanimous)
- Authorized staff discretion to implement fund swaps with NCDOT (Unanimous)
- Waived submittal limit rule for FY22 LAPP projects delayed by NCDOT (Unanimous)
Technical Coordinating Committee
The NC Capital Area Metropolitan Planning Organization's Technical Coordinating Committee will hold a virtual meeting to review transportation planning updates. Key actions include recommending approval for SPOT 6 alternate criteria and providing a recommendation on the LAPP FFY2022 submittal policy. The committee will also receive informational updates on the Triangle Bikeway Study, the 2045 Metropolitan Transportation Plan Amendment, and the FY 2020 operating budget.
- Recommend approval of SPOT 6 alternate criteria
- Provide recommendation on LAPP FFY2022 submittal policy
- Receive information on Triangle Bikeway Study
- Receive information on 2045 Metropolitan Transportation Plan Amendment
- Receive information on FY 2020 Operating Budget and Member Shares
The committee recommended approval of alternate SPOT 6 scoring criteria to prioritize safety over freight. It also recommended that NCDOT-caused delays on prior projects not penalize applicants for the FFY2022 LAPP call. The September 2020 meeting minutes were approved.
- Approved September 2020 Meeting Minutes Draft (Unanimous)
- Recommended approval of SPOT 6 - Alternate Criteria to the Executive Board (Unanimous)
- Recommended that NCDOT-caused delays on prior LAPP projects not count toward FFY2022 submittal limits (Unanimous)
Executive Board
The NC Capital Area Metropolitan Planning Organization Executive Board meets virtually to conduct a public hearing on the FY2020-2029 Transportation Improvement Program Amendment #2. The board also votes to approve 2021 Transit Asset Management performance targets and endorse the GoRaleigh 5310 Program Management Plan. Additionally, the board reviews funding updates for CAMPO projects and receives information on the Wake Bus Rapid Transit Western Corridor Locally Preferred Alternative.
- Public hearing on FY2020-2029 Transportation Improvement Program Amendment #2
- Approval of 2021 Performance Measures and Targets for Transit Asset Management
- Endorsement of the updated GoRaleigh 5310 Program Management Plan
- Approval of deadline extension for prior year LAPP projects to receive funding authorization through September 30, 2021
- Informational review of the Wake Bus Rapid Transit Western Corridor Locally Preferred Alternative
The Executive Board unanimously approved extending the funding authorization deadline for prior year LAPP projects to September 30, 2021. The board also approved several transit performance measures and the August 2020 meeting minutes. A public hearing was held regarding the FY2020-2029 Transportation Improvement Program Amendment #2.
- Approved deadline extension for prior year LAPP projects to September 30, 2021 (Unanimous)
- Approved August 2020 Meeting Minutes (Unanimous)
- Endorsed updated GoRaleigh 5310 Program Management Plan (Unanimous)
- Approved 2021 Performance Measures and Targets for Transit Asset Management and State of Good Repair (Unanimous)
- Conducted public hearing for FY2020-2029 Transportation Improvement Program Amendment #2
Technical Coordinating Committee
The NC Capital Area Metropolitan Planning Organization's Technical Coordinating Committee will review and recommend actions on several transportation planning documents. Key items include an amendment to the FY2020-2029 Transportation Improvement Program, updates to the 5310 Program Management Plan, and transit asset management targets. The meeting is held virtually due to COVID-19.
- Recommend approval of Amendment #2 to FY2020-2029 Transportation Improvement Program
- Recommend endorsement of the updated GoRaleigh 5310 Program Management Plan
- Recommend approval of 2021 Performance Measures and Targets for Transit Asset Management
- Provide recommendation on September 30, 2020 deadline for FFY2019 and prior year LAPP projects
- Receive information on Locally Preferred Alternative for Wake Bus Rapid Transit: Western Corridor
The Technical Coordinating Committee approved the August 2020 meeting minutes. The committee recommended that the Executive Board approve updates to the 5310 Program Management Plan, Transit Asset Management targets, and the FY2020-2029 Transportation Improvement Program Amendment #2.
- Approved August 2020 TCC Meeting Minutes (Unanimous)
- Recommended approval of 5310 Enhanced Mobility of Seniors and Individuals with Disabilities Program Management Plan Update (Unanimous)
- Recommended approval of 2021 Transit Asset Management Performance Measures & Targets for State of Good Repair (Unanimous)
- Recommended approval of FY2020-2029 Transportation Improvement Program Amendment #2 (Unanimous)
- Recommended approval of CAMPO Projects and Programs Funding Update (Unanimous)
Executive Board
The NC Capital Area Metropolitan Planning Organization Executive Board met virtually to review transportation planning updates for Wake County and surrounding areas. Key decisions included approving proposed changes to the Locally Administered Projects Program (LAPP) for FY2022 and adopting a Complete Streets Resolution. The board also received informational reports on the Fayetteville-Raleigh Rail Passenger Feasibility Study and the R.E.D. Priority Bus Lanes Study.
- Approval of LAPP FY2022 Proposed Changes and Target Modal Investment Mix
- Adoption of the Capital Area MPO Complete Streets Resolution
- Approval of the CAMPO SRTS Program Data Sharing MOA
- Informational review of the Fayetteville-Raleigh Rail Passenger Feasibility Study
- Informational review of the R.E.D. Priority Bus Lanes Study
The Executive Board approved its draft 2050 Metropolitan Transportation Plan goals, objectives, and performance measures by unanimous vote, along with the full consent agenda. The consent agenda included the July 2020 minutes, FY2022 LAPP changes and target modal investment mix, FY2020-2029 TIP Amendment #2, a Complete Streets Resolution, and a Safe Routes to School data-sharing agreement. The board received the R.E.D. Priority Bus Lanes Study and the Fayetteville-Raleigh Rail Passenger Feasibility Study as information only; no corridor was selected. Budget, project, and staff reports were also received as information.
- Approved consent agenda (unanimous)
- Approved July 2020 Executive Board minutes
- Approved FY2022 LAPP proposed changes and target modal investment mix; opened 'One Call for All' through October 30, 2020
- Approved FY2020-2029 Transportation Improvement Program Amendment #2
- Approved Capital Area MPO Complete Streets Resolution
- Approved CAMPO SRTS Program Data Sharing MOA
- Approved DRAFT MTP 2050 Goals, Objectives, and Performance Measures (unanimous)
- Received R.E.D. Priority Bus Lanes Study and Fayetteville-Raleigh Rail Passenger Feasibility Study as information
Technical Coordinating Committee
The Capital Area MPO Technical Coordinating Committee is meeting virtually to review transportation planning updates. Key actions include adopting a Complete Streets Resolution and recommending approval of the draft 2050 Metropolitan Transportation Plan goals. The committee will also review proposed changes to the Locally Administered Projects Program for FY2022.
- Adopt the Capital Area MPO Complete Streets Resolution
- Recommend approval of LAPP FY2022 Proposed Changes and Target Modal Investment Mix
- Consider recommendation to approve draft MTP 2050 Goals, Objectives, and Performance Measures
- Approve Memorandum of Agreement for CAMPO SRTS Program Data Sharing
- Receive information on R.E.D. Priority Bus Lanes Study and Fayetteville-Raleigh Rail Passenger Feasibility Study
The Technical Coordinating Committee approved its June 2020 minutes and voted unanimously to recommend several items to the Executive Board: the draft 2050 Metropolitan Transportation Plan goals, objectives and performance measures; a renewed Complete Streets resolution; a Safe Routes to School data-sharing agreement with Wake County Public Schools; and the LAPP FY2022 proposed changes and target modal investment mix. The committee also received as information the R.E.D. Priority Bus Lanes Study, the Fayetteville-Raleigh Rail Passenger Feasibility Study, the FY2020-2029 TIP Amendment #2, and an update on Wake Transit revenue shortfalls. No items were denied or tabled.
- Approved June 2020 TCC meeting minutes (unanimous)
- Recommended approval of draft 2050 MTP Goals, Objectives and Performance Measures to Executive Board (unanimous)
- Recommended approval of Capital Area MPO Complete Streets Resolution to Executive Board (unanimous)
- Recommended approval of CAMPO SRTS Program Data Sharing MOA with WCPSS to Executive Board (unanimous)
- Recommended approval of LAPP FY2022 Proposed Changes and Target Modal Investment Mix to Executive Board (unanimous)
- Received R.E.D. Priority Bus Lanes Study as information
- Received Fayetteville-Raleigh Rail Passenger Feasibility Study as information
- Received FY2020-2029 TIP Amendment #2 and Wake Transit update as information
Executive Board
The NC Capital Area Metropolitan Planning Organization Executive Board meets virtually to adopt updates to its Public Participation Plan and Air Quality Memorandum of Agreement. The board conducts a public hearing on proposed changes to the Locally Administered Projects Program (LAPP) for FY2022 and the target modal investment mix. Additional items include informational updates on the Wake Transit Vision Plan, FY2020 budget member shares, and project status reports.
- Public hearing on Locally Administered Projects Program (LAPP) FY2022 proposed changes and target modal investment mix
- Adoption of Public Participation Plan Update regarding Electronic Meetings
- Authorization for Executive Director to execute updated Air Quality Memorandum of Agreement (MOA)
- Informational update on Wake Transit Vision Plan development and FY 21 Work Plan Reassessment
- Informational review of FY 2020 Operating Budget and Member Shares
The Executive Board unanimously approved the June 2020 meeting minutes, a Public Participation Plan update, and an Air Quality Memorandum of Agreement. Staff presented proposed changes to the Locally Administered Projects Program (LAPP) for FY2022, which were received as information following a public hearing with no public comments. Additionally, staff reported that Wake Transit projected revenues have decreased by $107 million to $250 million due to the pandemic, potentially delaying some capital projects.
- Approved June 2020 Meeting Minutes (unanimous)
- Adopted Public Participation Plan Update for Electronic Meetings (unanimous)
- Authorized Executive Director to execute updated Air Quality MOA (unanimous)
- Received LAPP FY2022 Proposed Changes and Target Modal Investment Mix as information
- Received Wake Transit Vision Plan and FY21 Work Plan Reassessment as information
- Received FY 2020 Member Shares and Operating Budget reports as information
Executive Board
The NC Capital Area Metropolitan Planning Organization Executive Board met virtually to approve the FY 2021 Recommended Wake Transit Work Plan and a contract with HDR, Inc. for a Bus on Shoulder Study. The board also considered Amendment #1 to the FY2020-2029 Transportation Improvement Program and held a public hearing on updating the Public Participation Plan for electronic meetings. Additional items included reviewing the draft MTP 2050 goals and receiving updates on NCDOT projects and budget status.
- Approval of the FY 2021 Recommended Wake Transit Work Plan and project agreements
- Contract approval with HDR, Inc. for the Bus on Shoulder Study
- Consideration of Amendment #1 to the FY2020-2029 Transportation Improvement Program
- Public hearing on the Public Participation Plan Update regarding electronic meetings
- Review of DRAFT MTP 2050 Goals, Objectives, and Performance Measures
The Executive Board unanimously approved a series of consent agenda items, including the FY 2021 Wake Transit Work Plan and an amendment to the Transportation Improvement Program. The board also authorized legal services contracts and a bus study. Several reports on funding shortages and regional studies were received as information.
- Approved FY 2021 Recommended Wake Transit Work Plan (Unanimous)
- Approved FY2020-2029 Transportation Improvement Program Amendment #1 (Unanimous)
- Adopted Resolution of Support for 2020 NCDOT Bicycle and Pedestrian Planning Grant Application (Unanimous)
- Approved contract with HDR, Inc for Bus on Shoulder Study (Unanimous)
- Authorized legal services engagement with Parker Poe and Cauley Pridgen (Unanimous)
- Approved Executive Board May 20, 2020 Meeting Draft Minutes (Unanimous)
- Declared a July Executive Board Meeting will be held virtually
Technical Coordinating Committee
The NC Capital Area Metropolitan Planning Organization's Technical Coordinating Committee will hold a virtual meeting to recommend actions on the FY 2021 Recommended Wake Transit Work Plan and the 2020 NCDOT Bicycle and Pedestrian Planning Grant Application. The committee will also review the draft 2050 Metropolitan Transportation Plan goals and objectives for public feedback. Additionally, the body will approve the May 2020 minutes and receive informational updates on the Locally Administered Projects Program and the Northeast Area Study.
- Recommend Executive Board approval of the FY 2021 Recommended Wake Transit Work Plan
- Recommend resolution endorsing the 2020 NCDOT Bicycle and Pedestrian Planning Grant Application for Fuquay-Varina
- Review and provide feedback on DRAFT MTP 2050 Goals, Objectives, and Performance Measures
- Recommend Executive Board approval of the Public Participation Plan Update regarding electronic meetings
- Receive informational updates on the Locally Administered Projects Program (LAPP) FY2022 proposed changes
The Technical Coordinating Committee unanimously recommended several items to the Executive Board, including a revised transit work plan with reduced revenues due to COVID-19. The committee also recommended updates to the Public Participation Plan to allow for solely electronic meetings.
- Approved May 7, 2020 Meeting Draft Minutes (Unanimous)
- Recommended approval of Public Participation Plan Update for electronic meetings (Unanimous)
- Recommended approval of 2020 NCDOT Bicycle and Pedestrian Planning Grant Application for Fuquay-Varina (Unanimous)
- Recommended approval of FY 2021 Wake Transit Work Plan (Unanimous)
Executive Board
The NC Capital Area Metropolitan Planning Organization Executive Board meets virtually to approve the FY 2020 Wake Transit Work Plan 4th Quarter Amendment. The board conducts a public hearing on the FY2020-2029 Transportation Improvement Program Amendment #1 and receives the FY 2021 Recommended Wake Transit Work Plan. Additional items include updates on project funding delays due to COVID-19 and the FY 2020 operating budget.
- Approval of FY 2020 Wake Transit Work Plan 4th Quarter Amendment Request
- Public hearing on FY2020-2029 Transportation Improvement Program Amendment #1
- Receipt of FY 2021 Recommended Wake Transit Work Plan
- Informational update on CAMPO Projects and Programs Funding and COVID-19 schedule delays
- Informational review of FY 2020 Operating Budget and Member Shares
The Executive Board approved the FY 2020 Wake Transit Work Plan 4th Quarter Amendment Request and the April 15, 2020 meeting minutes. Several reports on transportation funding delays and planning updates were received as information.
- Approved Executive Board April 15, 2020 Meeting Draft Minutes (Unanimous)
- Approved FY 2020 Wake Transit Work Plan 4th Quarter Amendment Request (Unanimous)
Technical Coordinating Committee
The NC Capital Area Metropolitan Planning Organization's Technical Coordinating Committee will review and recommend approval for Amendment #1 to the FY2020-2029 Transportation Improvement Program. The committee will also consider recommending approval of the FY 2020 Wake Transit Work Plan 4th Quarter Amendment Request to the Executive Board. Additional items include receiving updates on project schedule delays due to COVID-19 and reviewing the FY 2020 operating budget.
- Recommend approval of Amendment #1 to the FY2020-2029 Transportation Improvement Program
- Consider recommending approval of the FY 2020 Wake Transit Work Plan 4th Quarter Amendment Request
- Receive information on COVID-19 related TIP project schedule delays released April 21
- Receive information on the FY 2020 Operating Budget and Member Shares
- Receive information on the Update to Public Participation Plan regarding electronic meetings
The Technical Coordinating Committee recommended approval of an amendment to the FY2020-2029 Transportation Improvement Program and a project sponsor change for the Wake Transit Work Plan. The committee also received reports on NCDOT funding delays caused by the COVID-19 pandemic.
- Approved March 5, 2020 Meeting Draft Minutes (unanimous)
- Recommended approval of FY2020-2029 Transportation Improvement Program Amendment #1 (unanimous)
- Recommended approval of FY 2020 Wake Transit Work Plan 4th Quarter Amendment Request (unanimous)
Executive Board
The Capital Area MPO Executive Board will hold public hearings on the methodology for selecting projects for Bonus Allocation funds and the prioritized list for NC 540 bonus allocation programming. The board will also consider consent items including funding agreements, FTA fund distributions, and bicycle/pedestrian planning grant applications. Due to COVID-19, the meeting will be held virtually.
- Public hearing on CAMPO Bonus Allocation Methodology
- Public hearing on NC 540 Bonus Allocation Programming
- Approval of FFY 2020 FTA Section 5307, 5340, 5339 and CARES Act fund distribution
- Authorization to execute FY 2020 Wake Transit Work Plan project agreements
- Recommendation of NCDOT Bicycle and Pedestrian Planning Grant applications for Garner, Rolesville, and Holly Springs
The CAMPO Executive Board held three public hearings and unanimously approved the Bonus Allocation methodology, the prioritized list of projects for NC 540 bonus funds, and the draft Prioritization 6.0 modal candidate project lists. The board also approved the consent agenda, including funding agreements and transit fund distributions. No public speakers addressed the hearings.
- Approved Bonus Allocation methodology (unanimous)
- Approved NC 540 Bonus Allocation programming list (unanimous)
- Approved Prioritization 6.0 modal candidate project lists (unanimous)
- Approved consent agenda including UPWP agreements, FTA fund sub-allocation, and Wake Transit work plan delegation (unanimous)
- Added Holly Springs grant application to consent agenda (unanimous)
Executive Board
The NC Capital Area Metropolitan Planning Organization Executive Board is meeting to approve funding amendments for commuter rail early project development and sign a Memorandum of Understanding for the Greater Triangle Commuter Rail Project. The board will also conduct a public hearing on Transportation Improvement Program Amendment #11 and consider a Resolution of Support for the S-Line/SA-Line. Additional items include authorizing a funding agreement for the Triangle Bikeway Implementation Study and reviewing NC 540 Bonus Allocation programming.
- Approval of FY20 Wake Transit Work Plan amendment for commuter rail early project development
- Authorization to sign MOU for Greater Triangle Commuter Rail Project
- Public hearing on FY2018-2027 Transportation Improvement Program Amendment #11
- Consideration of S-Line/SA-Line Resolution of Support
- Authorization to sign Interlocal Funding Agreement for Triangle Bikeway Implementation Study
The Executive Board approved a resolution of support for the NCDOT's acquisition of the S-Line and SA-Line rail corridors. The board also approved Amendment #11 of the FY2018-2027 Transportation Improvement Program and several commuter rail and bikeway agreements.
- Approved S-Line/SA-Line Resolution of Support (unanimous)
- Approved FY2018-2027 Transportation Improvement Program Amendment #11 (unanimous)
- Approved FY20 Wake Transit Work Plan amendment for commuter rail early project development (unanimous)
- Approved participation in Greater Triangle Commuter Rail Project MOU (unanimous)
- Authorized Interlocal Funding Agreement for Triangle Bikeway Implementation Study (unanimous)
- Approved release of NC 540 Bonus Allocation project list for public review (unanimous)
- Approved February 2020 Executive Board meeting minutes (unanimous)
Technical Coordinating Committee
The Technical Coordinating Committee for the NC Capital Area MPO is meeting to review transportation planning items. Key actions include recommending approval of a Memorandum of Understanding for the Greater Triangle Commuter Rail Project and reviewing the NC 540 Bonus Allocation project list. The committee will also consider amendments to the FY2018-2027 Transportation Improvement Program and the FY2020 Wake Transit Work Plan.
- Recommend approval of MOU for Greater Triangle Commuter Rail Project development
- Review NC 540 Bonus Allocation project candidate list for public comment
- Recommend approval of FY2018-2027 Transportation Improvement Program Amendment #11
- Consider FY2020 Wake Transit Work Plan amendment for commuter rail early project development
- Recommend approval of S-Line Resolution of Support
The Technical Coordinating Committee voted unanimously to recommend several items to the Executive Board: Amendment #11 to the FY2018-2027 Transportation Improvement Program, a $6 million FY20 Wake Transit Work Plan amendment for commuter rail early project development (with a condition that no funds be spent until an MOU on cost share is approved), CAMPO's participation in the commuter rail MOU, release of the NC 540 bonus allocation project list for public review, and a resolution supporting NCDOT's purchase of the S-Line/SA-Line rail corridors. The committee also recommended that the Executive Board agree to plan and program projects toward the State's safety performance targets. All votes were unanimous. Informational items on LAPP funding, Prioritization 6.0 candidate projects, the Wake Transit Plan update, and budget reports were received without action.
- Recommended approval of FY2018-2027 TIP Amendment #11 (unanimous)
- Recommended approval of $6M FY20 Wake Transit Work Plan amendment for commuter rail early project development, conditioned on an approved cost-share MOU (unanimous)
- Recommended approval of CAMPO's participation in the Greater Triangle Commuter Rail MOU and authorized Executive Director to sign (unanimous)
- Recommended releasing the NC 540 bonus allocation project candidate list for public review and comment, with a public hearing on April 15, 2020 (unanimous)
- Recommended approval of the S-Line/SA-Line Resolution of Support (unanimous)
- Recommended that the Executive Board agree to plan and program projects toward the State's safety performance targets (unanimous)
- Approved February 6, 2020 TCC minutes (unanimous)
Executive Board
The NC Capital Area Metropolitan Planning Organization (CAMPO) Executive Board will hold a public hearing to approve the FY2021 Locally Administered Projects Program (LAPP) investment mix and adopt the Unified Planning Work Program. The board will also release the Prioritization 6.0 modal candidate project lists for public comment from February 20 to April 12, 2020. Consent items include approving amendments to the Wake Transit Work Plan and allowing prior-year LAPP projects in Apex and Angier to continue with funding.
- Public hearing to approve the Draft FFY2021 LAPP Investment Mix.
- Release of Prioritization 6.0 candidate project lists for public review from Feb 20 to Apr 12, 2020.
- Approval of Amendment #1 to the 2018 Coordinated Public Transit-Human Services Transportation Plan.
- Consent to allow Town of Apex Lake Pine Drive Improvements and Town of Angier NC 210 Sidewalk Connections to continue with LAPP funding.
- Adoption of the FY 2021 Unified Planning Work Program and MPO Self-Certification.
The CAMPO Executive Board approved the FY2021 Locally Administered Projects Program (LAPP) Investment Mix, a $25 million program including CMAQ, by unanimous vote. The board also adopted the FY21 Unified Planning Work Program and MPO Self-Certification, and chose Option 2 for budgeting indirect costs. It released the Prioritization 6.0 candidate project lists and the CAMPO Bonus Allocation methodology and project list for public review. Several items were received as information, including the US Census 2020 update and the Commuter Corridors Study.
- Approved FY2021 LAPP Investment Mix totaling $25M (unanimous)
- Adopted FY21 UPWP and MPO Self-Certification, with additional STBG-DA and local match funding (unanimous)
- Approved Option 2 for indirect cost budgeting in FY21 and future budgets (unanimous)
- Released Prioritization 6.0 candidate project lists for public comment Feb 20–Apr 12, 2020 (unanimous)
- Released CAMPO Bonus Allocation methodology and proposed project list for public comment Feb 20–Apr 12, 2020 (unanimous)
- Approved Consent Agenda, including January 2020 minutes, LAPP project continuations, and Wake Transit Work Plan amendments (unanimous)
Technical Coordinating Committee
The Technical Coordinating Committee for the NC Capital Area MPO is reviewing the FY2021 Locally Administered Projects Program investment mix and the Prioritization 6.0 candidate project lists. The committee will also consider amendments to the human services transportation plan and approve the FY 2021 Unified Planning Work Program. These items are recommended for adoption by the Executive Board, with public comment periods scheduled for February and April 2020.
- Recommend approval of the Draft FFY2021 LAPP Investment Mix
- Recommend release of Prioritization 6.0 candidate project lists for public review from Feb 20 to Apr 12, 2020
- Consider recommending approval of Amendment #1 to the 2018 Human Services Transportation Plan
- Review CAMPO Bonus Allocation Methodology and proposed project lists
- Consider recommending approval of FY 2020 Wake Transit Work Plan 3rd Quarter Amendments
The Technical Coordinating Committee recommended the approval of the FY2021 LAPP Investment Mix and the FY21 Unified Planning Work Program. The committee also recommended allowing two prior-year LAPP projects to continue receiving funding and approved several Wake Transit Work Plan amendments.
- Approved January 2020 Draft Minutes (unanimous)
- Recommended continuing LAPP funding for Town of Apex Lake Pine Drive and Town of Angier NC 210 projects (unanimous)
- Recommended FY2021 LAPP Investment Mix to Executive Board (unanimous)
- Recommended adoption of FY 21 UPWP and MPO Self-Certification (unanimous)
- Recommended releasing Prioritization 6.0 candidate project lists for public review (unanimous)
- Recommended releasing Bonus Allocation Methodology and project list for public review (unanimous)
- Recommended approval of amended 2018 Coordinated Public Transit-Human Services Transportation Plan (unanimous)
- Recommended approval of FY 2020 Wake Transit Work Plan 3rd quarter amendments (unanimous)
Executive Board
The Capital Area MPO Executive Board will elect a 2020 Chair and Vice Chair, approve contracts for the Triangle Bikeway Implementation Plan and Northeast Area Study Update, and receive updates on transit, federal rescissions, and the FY2021 work plan. Public comments are invited at the start of the meeting.
- Elections for Executive Board Chair and Vice Chair, 2020
- Contracts for Triangle Bikeway Implementation Plan and Northeast Area Study Update
- Federal Rescission Update and FFY2019 Year End Report
- FY 2021 Draft Wake Transit Work Plan and FY 2019 Wake Transit Annual Report
- FY2021 Locally Administered Projects Program Investment Mix
The Executive Board unanimously elected Sig Hutchinson as Chair and Vivian Jones as Vice Chair for 2020. The board also approved contracts for the Triangle Bikeway Implementation Plan and Northeast Area Study Update, and allowed two Raleigh LAPP projects to continue with funding. Several reports were received as information, including the Greater Triangle Commuter Rail Alternatives Analysis and the FY 2021 Draft Wake Transit Work Plan.
- Elected Sig Hutchinson as Chair for 2020 (unanimous)
- Elected Vivian Jones as Vice Chair for 2020 (unanimous)
- Approved contracts for Triangle Bikeway Implementation Plan and Northeast Area Study Update (unanimous)
- Approved consent agenda including November 2019 draft minutes (unanimous)
- Allowed City of Raleigh Leesville Safe Routes to School and Crabtree Creek Greenway LAPP projects to continue (unanimous)
Technical Coordinating Committee
The Technical Coordinating Committee for the NC Capital Area MPO will review preliminary results for the Greater Triangle Commuter Rail Alternatives Analysis. The body is asked to recommend approval for contracts related to the Triangle Bikeway Implementation Plan and the Northeast Area Study Update. Additionally, the committee will elect its 2020 Chair and Vice Chair and review the FY 2021 Locally Administered Projects Program investment mix.
- Recommendation to approve contracts for the Triangle Bikeway Implementation Plan and Northeast Area Study Update
- Review of preliminary results for the Greater Triangle Commuter Rail Alternatives Analysis
- Election of the 2020 TCC Chair and Vice Chair
- Recommendation on whether to allow prior year projects to continue with LAPP funding
- Review of the FY 2021 Locally Administered Projects Program Investment Mix
The Technical Coordinating Committee recommended approval of the Triangle Transportation Demand Management Plan Update and Goals, which includes six goals aimed at reducing reliance on single-occupancy vehicles. The committee also unanimously approved the November 2019 meeting minutes, elected Juliet Andes as Chair and Eric Lamb as Vice Chair for 2020, and recommended allowing prior-year LAPP projects to continue with funding. Several informational reports were received, including the Commuter Corridors Study, NC Moves 2050 Update, and Greater Triangle Commuter Rail Alternatives Analysis.
- Approved November 2019 meeting minutes (unanimous)
- Elected Juliet Andes as TCC Chair for 2020 (unanimous)
- Elected Eric Lamb as TCC Vice Chair for 2020 (unanimous)
- Recommended approval of Triangle TDM Plan Update and Goals (unanimous)
- Recommended prior-year LAPP projects continue with LAPP funding (unanimous)
- Recommended Executive Board approve contracts for Triangle Bikeway Implementation Plan ($398,279) and Northeast Area Study Update ($400,000) (unanimous)