Campo, CO

Campo public meetings in 2022

20 substantive meetings from 2022, with official agendas or minutes and plain-English summaries.

Wed Nov 16, 2022 · 4:00 PM

Executive Board

CAMPO board to vote on commuter rail MOU extension and TIP amendment

The Capital Area MPO Executive Board will consider consent items including the Wake Transit Community Engagement Policy, a Work Plan Amendment Policy update, an extension agreement for the Greater Triangle Commuter Rail project, and FY 2023 Q2 Work Plan amendments. A public hearing will be held on Amendment #10 to the FY2020-2029 Transportation Improvement Program. Action items include approving the CAMPO Lead Planning Agency agreement and receiving updates on the Wake Bus Plan prioritization policy, budget, and member shares.

transportationtransitbudgetpublic-hearingcommuter-railplanning
✓ Decided: CAMPO board endorses I-40 widening option, approves consent agenda

The Executive Board unanimously approved the consent agenda, including the Wake Transit Community Engagement Policy, Work Plan Amendment Policy, and an extension agreement for the Greater Triangle Commuter Rail project. They also approved Amendment #10 to the FY2020-2029 Transportation Improvement Program after a public hearing. The board endorsed Option 2 to amend the 2050 MTP for the I-5701 project, which would widen I-40 to include auxiliary lanes. Additionally, they approved the CAMPO Lead Planning Agency agreement with the Town of Cary.

Conference Room
Thu Nov 3, 2022 · 10:00 AM

Technical Coordinating Committee

Committee to recommend I-5701 Alternative 1 as the preferred route

The NC Capital Area MPO Technical Coordinating Committee is meeting virtually to review transportation planning updates. The primary decision is a recommendation for the Executive Board to endorse Alternative 1 for NCDOT Project I-5701. The committee will also review the preliminary 2024-2033 Transportation Improvement Program and various transit policy updates.

transportationplanninghighwaystransitbudget
✓ Decided: TCC recommends I-5701 MTP amendment for auxiliary lanes

The Technical Coordinating Committee voted to recommend that the Executive Board endorse Option 2, which would amend the 2050 Metropolitan Transportation Plan to allow additional auxiliary lanes on I-40 as part of the I-5701 project. The recommendation passed by majority vote, with one member voting no. The committee also approved several other items, including the October minutes, FY 2023 Q2 Wake Transit Work Plan amendments, and policy updates.

Conference Room
Wed Oct 19, 2022 · 4:00 PM

Executive Board

MPO board reviews FY22 budget and I-4739/I-5111 project updates

The NC Capital Area Metropolitan Planning Organization Executive Board meets to approve consent items including the FY23 Unified Planning Work Program and a Master Services Agreement for non-motorized data. The board holds a public hearing on the Wake Transit Community Engagement Policy and reviews informational updates on the FY2022 operating budget and member shares. Additionally, the board receives information on transportation improvements for Projects I-4739/I-5111 and Amendment #10 to the FY2020-2029 Transportation Improvement Program.

transportationbudgetplanningpublic-hearingtransit
✓ Decided: Executive Board approves consent agenda items unanimously

The Executive Board met on October 19, 2022, and approved all consent agenda items by unanimous vote, including the September minutes, FY 2023 UPWP Amendment #1, a master services agreement for non-motorized data, and GoTriangle bus operations reimbursement requests. The board also received informational updates on the I-4739/I-5111 transportation improvements, TIP Amendment #10, budget, and project updates. No substantive decisions were made beyond the consent agenda approvals.

Conference Room
Thu Oct 6, 2022 · 10:00 AM

Technical Coordinating Committee

MPO committee reviews I-4739/I-5111 projects and FY2023 work program amendment

The NC Capital Area Metropolitan Planning Organization's Technical Coordinating Committee met virtually to review transportation projects and planning documents. The committee considered recommending the Executive Board adopt Amendment #1 to the FY 2023 Unified Planning Work Program and approve a Master Services Agreement for the Non-Motorized Volume Data Program. Additional items included receiving information on the Wake Transit Community Engagement Policy and Amendment #10 to the FY2020-2029 Transportation Improvement Program.

transportationplanninghighwaystransitbudget
✓ Decided: TCC approves FY 2023 UPWP amendment and Master Services Agreement

The Technical Coordinating Committee unanimously approved Amendment #1 to the FY 2023 Unified Planning Work Program, which includes budget adjustments and an increase in member shares, and recommended the Executive Board approve a Master Services Agreement for the Non-Motorized Volume Data Program. The committee also received informational updates on the I-4739/I-5111 transportation projects, the Wake Transit Community Engagement Policy, and Amendment #10 to the FY 2020-2029 Transportation Improvement Program. No substantive decisions were made on the informational items.

Conference Room
Wed Sep 21, 2022 · 4:00 PM

Executive Board

CAMPO holds public hearing to approve Amendment #9 to the FY2020-2029 Transportation Improvement Program

The NC Capital Area Metropolitan Planning Organization Executive Board meets to conduct a public hearing on Amendment #9 to the FY2020-2029 Transportation Improvement Program (TIP). The board also votes to adopt 2023 Performance Measures and Targets for Transit Asset Management and State of Good Repair. Additionally, the board approves the draft CAMPO Organizational Study and receives informational updates on the FY2024-2033 Preliminary Draft State Transportation Improvement Program.

transportationplanningtransitbudgetpublic-hearing
✓ Decided: CAMPO Board approves organizational study, TIP amendment, transit targets

The CAMPO Executive Board approved the draft Organizational Study, which recommends adding staff positions and salary adjustments, and approved Amendment #9 to the FY2020-2029 Transportation Improvement Program. The board also adopted 2023 Transit Asset Management performance targets. Several items were received as information only, including the FY2024-2033 draft STIP and the Wake Transit Work Plan amendment policy update.

Conference Room
Thu Sep 1, 2022 · 10:00 AM

Technical Coordinating Committee

CAMPO TCC to recommend adoption of 2023 Transit Asset Management measures

The NC Capital Area Metropolitan Planning Organization's Technical Coordinating Committee is meeting virtually to review transportation planning updates. The committee will recommend the adoption of 2023 Performance Measures and Targets for Transit Asset Management and State of Good Repair. They will also recommend approval of Amendment #9 to the FY2020-2029 Transportation Improvement Program. Other items include receiving information on the FY2024-2033 Preliminary Draft STIP, the CAMPO Organizational Study, and FY 2022 budget projections.

transportationplanningtransitbudgetinfrastructure
✓ Decided: TCC approves transit asset targets and TIP amendment, hears STIP update

The Technical Coordinating Committee approved the 2023 Transit Asset Management performance measures and targets, and Amendment #9 to the FY2020-2029 Transportation Improvement Program, both by unanimous vote. The committee also received informational updates on the draft State Transportation Improvement Program, the CAMPO organizational study, and the FY 2023 Unified Planning Work Program amendment. No public comments were made.

Conference Room
Wed Aug 17, 2022 · 4:00 PM

Executive Board

CAMPO holds public hearing on FFY 2024 Locally Administered Projects Program

The NC Capital Area Metropolitan Planning Organization Executive Board meets to approve consent items, including funding agreements for the Southeast Area Study and Mobility Management Study. A public hearing is held to consider approval of the FFY 2024 Locally Administered Projects Program (LAPP) and open the annual call for projects. The board also reviews the CAMPO Organizational Study, the Decennial Administrative Review, and updates to the FY2020-2029 Transportation Improvement Program.

transportationplanningbudgetpublic-hearingregional
✓ Decided: CAMPO board votes to make Town of Cary its new lead planning agency

The Executive Board unanimously approved a motion to designate the Town of Cary as CAMPO's new Lead Planning Agency (LPA), replacing the City of Raleigh. The decision followed a decennial administrative review that considered letters of interest from Cary, Raleigh, and Triangle J Council of Governments. The board also approved the FY 2024 Locally Administered Projects Program and opened the annual call for projects. Several other items were approved on the consent agenda or received as information.

Conference Room
Thu Aug 4, 2022 · 10:00 AM

Technical Coordinating Committee

CAMPO TCC to vote on LAPP funding for Rolesville and Clayton

The NC Capital Area Metropolitan Planning Organization's Technical Coordinating Committee meets virtually to review transportation planning updates. Key decisions include approving additional Locally Administered Projects Program (LAPP) funding requests from the Town of Rolesville and Town of Clayton. The committee will also recommend approval of the FFY 2024 LAPP Program and authorize a funding agreement amendment for a Mobility Management Program Implementation Study.

transportationplanningfundingtrafficpublic-transit
✓ Decided: TCC approves Western Wake traffic signal study for 2055 MTP

The Technical Coordinating Committee approved several items, including recommending the Western Wake Traffic Signal System Integration Study findings for inclusion in the 2055 Metropolitan Transportation Plan, approving additional funding requests from the Town of Rolesville and Town of Clayton, and approving the FFY 2024 LAPP Program. The committee also authorized the Executive Director to sign a funding agreement amendment for the Mobility Management Program Implementation Study. Several items were received as information only, including the TIP Amendment #9 and the Preliminary Draft STIP.

Conference Room
Wed Jun 15, 2022 · 4:00 PM

Executive Board

CAMPO board to adopt FY 23 Wake Transit Work Plan and review STIP draft

The NC Capital Area Metropolitan Planning Organization Executive Board will vote to adopt the FY 23 Wake Transit Work Plan and authorize the purchase of office furniture. The board will also review the preliminary FY 2024-2033 State Transportation Improvement Program (STIP) and direct staff to gather more information on administrative structures for the CAMPO Decennial Review.

transportationplanningtransitbudgetinfrastructure
✓ Decided: CAMPO board approves consent agenda, directs LPA review

The CAMPO Executive Board approved the consent agenda, including minutes, office space purchase authorization, and the FY23 Wake Transit Work Plan. The board also directed staff to gather detailed proposals from three agencies interested in serving as the Lead Planning Agency (LPA) for CAMPO. Several informational items were received, including updates on the NCDOT mileage-based user fee pilot, a traffic signal integration study, and the draft STIP.

Conference Room
Thu Jun 2, 2022 · 10:00 AM

Technical Coordinating Committee

CAMPO TCC reviews FY23 Wake Transit Work Plan and FY2024-2033 Draft STIP

The NC Capital Area Metropolitan Planning Organization's Technical Coordinating Committee met virtually to review transportation planning updates. The committee received information on the Western Wake Traffic Signal System Integration Study and the FY2024-2033 Preliminary Draft State Transportation Improvement Program (STIP). A key action item involved recommending that the Executive Board adopt the FY 23 Wake Transit Work Plan and Project Delivery Groupings. The meeting also covered budget projections for FY 2022 and updates on the Locally Administered Projects Program (LAPP).

transportationplanningtransitbudgetinfrastructure
✓ Decided: TCC recommends FY23 Wake Transit Work Plan to Executive Board

The Technical Coordinating Committee approved the FY 2023 Wake Transit Work Plan and Project Delivery Groupings, recommending it to the Executive Board. The committee also approved the May 5, 2022 meeting minutes with corrections. Several items were received as information only, including the Western Wake Traffic Signal System Integration Study, Roadside Landscaping & Forestation Program, and the FY2024-2033 Preliminary Draft STIP.

Conference Room
Wed May 18, 2022 · 4:00 PM

Executive Board

CAMPO board to hold public hearings on strategic plan and transit work plan

The Capital Area MPO Executive Board will hold public hearings on a strategic plan update and the Wake Transit FY 23 Work Plan, and consider consent items including minutes, transit amendments, and FTA funding distribution. They will also receive updates on the Triangle Regional Travel Survey and electric vehicle infrastructure. The meeting is virtual due to COVID-19.

transportationtransitpublic-hearingbudgetstrategic-planelectric-vehiclesfederal-funding
✓ Decided: CAMPO Executive Board adopts 2022 Strategic Plan update

The board unanimously approved the CAMPO Strategic Plan update, which adds new focus areas including land use coordination, diversity and inclusion, bike-ped coordination, and transit advocacy. The board also approved the consent agenda, which included the April minutes, Wake Transit FY22 Q4 amendments, FTA fund sub-allocation, and authorization for the executive director to execute the Wake County ILA. Public hearings were held for the strategic plan and the FY23 Wake Transit Work Plan, but no public comments were made.

Conference Room
Thu May 5, 2022 · 10:00 AM

Technical Coordinating Committee

CAMPO TCC to recommend approval of 2022 strategic plan and FTA fund sub-allocations

The NC Capital Area Metropolitan Planning Organization's Technical Coordinating Committee will review transportation planning updates, including the Triangle Regional Travel Survey and electric vehicle infrastructure. The committee is asked to recommend approval of the CAMPO Strategic Plan and the sub-allocation of FY 2022 Federal Transit Administration funds. Additionally, the body will consider amendments to the Wake Transit FY 22 budget and review the FY 2023 Work Plan.

transportationplanningbudgettransitelectric-vehicles
✓ Decided: TCC recommends approval of CAMPO strategic plan and FTA fund allocations

The Technical Coordinating Committee recommended approval of the CAMPO Strategic Plan 2022 draft, the FFY 2022 FTA Section 5307/5340/5339 fund sub-allocation, and the Wake Transit FY22 Q4 amendments. It also received informational updates on the Triangle Regional Travel Survey, electric vehicle infrastructure, and the Wake Transit FY2023 Work Plan. All votes were unanimous.

Conference Room
Wed Apr 20, 2022 · 4:00 PM

Executive Board

CAMPO approves US 401 study amendment and FY2020-2029 TIP changes

The NC Capital Area MPO Executive Board met virtually to approve consent items including a lease for new office space and a contract amendment for the US 401 Corridor Study. The board held a public hearing to approve Amendment #8 to the FY2020-2029 Transportation Improvement Program and review the Triangle Bikeway Study. Additional items included informational updates on the FY 2022 operating budget, the Wake Transit FY 23 Work Plan, and the Strategic Plan Update.

transportationzoningbudgetinfrastructurepublic-hearing
✓ Decided: CAMPO board approves TIP Amendment #8 and bonus allocation project removals

The Executive Board unanimously approved Amendment #8 to the FY2020-2029 Transportation Improvement Program, which includes updates to regional projects and the removal of selected NC 540 Bonus Allocation projects from the Intersection Improvements List. The board also endorsed the Triangle Bikeway Study final report for future planning use and approved the consent agenda, including a lease for the Fenton location and a US 401 Corridor Study contract amendment. Other items were received as information only.

Conference Room
Thu Apr 7, 2022 · 10:00 AM

Technical Coordinating Committee

CAMPO TCC to recommend approval of FY2020-29 TIP Amendment #8

The NC Capital Area Metropolitan Planning Organization's Technical Coordinating Committee will review transportation planning updates for the Raleigh area. The primary action item is a recommendation to approve Amendment #8 to the FY2020-2029 Transportation Improvement Program. The committee will also receive informational reports on the Greater Triangle Commuter Rail Opportunity Analysis, the Strategic Plan Update, and the FY 2022 operating budget.

transportationplanningbudgetrailinfrastructure
✓ Decided: TCC approves TIP Amendment #8 and bonus allocation project removals

The Technical Coordinating Committee unanimously approved Amendment #8 to the FY2020-2029 Transportation Improvement Program and the removal of selected Bonus Allocation projects from the Intersection Improvements List. The committee also received informational updates on the Greater Triangle Commuter Rail Opportunity Analysis, the Strategic Plan, the Wake Transit FY23 Work Plan, and budget and project updates. No other substantive decisions were made.

Conference Room
Wed Mar 16, 2022 · 4:00 PM

Executive Board

CAMPO to revise US 401 Corridor Study scope to include new alternative W

The NC Capital Area Metropolitan Planning Organization Executive Board will vote to revise the scope and schedule of the US 401 Corridor Study to include an additional alternative (W: 401/55/210) alongside existing alternatives X and Z. The board will also approve the City of Raleigh’s request for additional funding for a Locally Administered Projects Program (LAPP) project and adopt an administrative modification to the FY 22 Unified Planning Work Program. Several other items, including the Triangle Bikeway Study and FY20-29 TIP Amendment #8, are listed for informational receipt only.

transportationplanninghighwaysbudgetbicycles
✓ Decided: Board adds Alternative W to US 401 corridor study

The Executive Board voted to revise the scope and schedule of the US 401 Corridor Study to include a new Alternative W (US 401/NC 55/NC 210) alongside the existing Alternatives X and Z for further study. The motion, made by Vice Chair Jones and seconded by Member Massengill, carried. The board also approved the consent agenda, which included the February minutes, an administrative modification to the FY 22 Unified Planning Work Program, and an additional funding request for a City of Raleigh project.

Conference Room
Thu Mar 3, 2022 · 10:00 AM

Technical Coordinating Committee

TCC to recommend Triangle Bikeway report, US 401 corridor update

The Technical Coordinating Committee will consider recommending approval of the Triangle Bikeway Study and Final Report, and will receive updates on the US 401 Corridor Study, the FY2020-29 TIP Amendment #8, and the Strategic Plan. The committee will also act on an administrative modification to the FY 22 Unified Planning Work Program and a funding request for a City of Raleigh project. Informational items include the FY 2022 budget and project updates.

transportationbikewaycorridor-studybudgettip-amendment
✓ Decided: TCC recommends three US 401 bypass alternatives for further study

The Technical Coordinating Committee voted unanimously to recommend Alternatives W, X, and Z for further study in the US 401 Corridor Study, adding Alternative W to the previously recommended X and Z. The committee also endorsed the Triangle Bikeway report, approved the FY 22 UPWP administrative modification, and recommended approval of an additional $2.715 million in CAMPO funds for Raleigh's Blue Ridge Road pedestrian improvements. All votes were unanimous.

Conference Room
Wed Feb 16, 2022 · 4:00 PM

Executive Board

CAMPO to approve 2050 Transportation Plan and FY 2023 funding programs

The NC Capital Area Metropolitan Planning Organization Executive Board meets virtually to conduct public hearings on the FY 2023 Unified Planning Work Program, FFY 2023 Locally Administered Projects Program, and Amendment #7 to the FY 2020-29 Transportation Improvement Program. The board also seeks final approval of the 2050 Metropolitan Transportation Plan and Air Quality Conformity Determination. Additional agenda items include updates on the NC 540 completion, I-40 widening projects, and safety performance measures.

transportationplanningbudgethighwayspublic-hearing
✓ Decided: CAMPO Board approves 2050 Metropolitan Transportation Plan

The CAMPO Executive Board unanimously approved the 2050 Metropolitan Transportation Plan and Air Quality Conformity Determination, the region's long-range transportation blueprint. The board also approved the FY 2023 Unified Planning Work Program, the FFY2023 Locally Administered Projects Program, and Amendment #7 to the FY2020-2029 Transportation Improvement Program. All votes were unanimous.

Conference Room
Thu Feb 3, 2022 · 10:00 AM

Technical Coordinating Committee

TCC to recommend final approval of 2050 Metropolitan Transportation Plan

The Technical Coordinating Committee will review and recommend action on several transportation planning items, including final approval of the 2050 Metropolitan Transportation Plan and Air Quality Conformity Determination, the FY 2023 Unified Planning Work Program, and the FFY2023 Locally Administered Projects Program. The committee will also receive updates on the NC 540 completion, I-40 widening, and safety performance targets. Public comments are invited at the start of the meeting.

transportationmetropolitan-planning-organizationbudgetsafetytransitpublic-hearing
Conference Room
Wed Jan 19, 2022 · 4:00 PM

Executive Board

Board to hold public hearing on 2050 Metropolitan Transportation Plan

The Capital Area MPO Executive Board will hold a public hearing on the 2050 Metropolitan Transportation Plan (MTP/CTP), a long-range regional transportation blueprint. The board will also elect its 2022 Chair and Vice Chair, consider a contract for the Southeast Area Study Update, and review the draft FY 2023 Unified Planning Work Program. Several items are consent agenda items, including minutes, a transit procurement MOU, and a TIP amendment.

transportationpublic-hearingbudgetplanningcontractselections
Conference Room
Thu Jan 6, 2022 · 10:00 AM

Technical Coordinating Committee

CAMPO TCC reviews draft FY 2023 transportation programs and elects new leadership

The NC Capital Area Metropolitan Planning Organization's Technical Coordinating Committee met virtually to review draft transportation planning documents for fiscal year 2023. The committee voted to elect a new Chair and Vice Chair for 2022 and recommended approval for a prior-year project request from the Town of Rolesville. Most other agenda items, including the 2050 Metropolitan Transportation Plan and budget projections, were received for information only.

transportationplanningbudgetpublic-worksregional-governance
✓ Decided: TCC elects new chair and vice chair for 2022

The Technical Coordinating Committee elected Ben Howell as Chair and Tracy Stephenson as Vice Chair for 2022, both by unanimous vote. The committee also unanimously recommended approval of the Town of Rolesville's request to move forward with the Main Street and Burlington Mills Road intersection realignment. Several informational reports were received, including the FY 2023 Unified Planning Work Program, safety performance targets, and the 2050 Metropolitan Transportation Plan, with no formal action taken on those items.

Conference Room