Niagara Frontier Transportation Authority public meetings in 2024
32 substantive meetings from 2024, with official agendas or minutes and plain-English summaries.
Budget Discussion
The Niagara Frontier Transportation Authority board discusses a proposed $333 million balanced budget for fiscal year 2026, highlighting aviation growth, rising Metro ridership, and strategic investments in system reliability, customer experience, and sustainability. The budget includes $29 million in Metro passenger fares and addresses inflation pressures and a growing capital repair backlog.
- $333M balanced budget proposed for FY2026
- $29M Metro passenger fares (pre-COVID: ~$35M)
- $24.8M Bailey Corridor Bus Rapid Transit allocation
- $10.7M for Electric Buses as part of system reliability
- $12M dedicated rail operating funding
The Board held a discussion regarding the proposed Fiscal Year 2025/26 budget and the Strategic Plan update. No formal votes were taken during this meeting. Formal approval of the budget is scheduled for the December 12, 2024, meeting.
Surface Transportation
The NFTA Surface Transportation Committee meets to discuss financials, performance metrics, and updates on multiple transit projects, including the Bailey Avenue Bus Rapid Transit (BRT) initiative. The committee also reviews safety reports and community engagement efforts.
- Bailey Avenue BRT project receives $102.7M federal grant for design and construction
- $3M NY State funding and $650K federal Areas of Persistent Poverty funding allocated for Bailey Avenue BRT
- October 2024 operating revenues $115K (4.2%) favorable, driven by $116K (4.3%) higher passenger fares
- DL&W Rail Station project secures $30M grant for egress and core improvements
- NFTA awarded $6.6M FHWA grant for ITS4US accessible trip planning and autonomous shuttle services
The committee received updates on the Bailey Bus Rapid Transit project and various rail rehabilitation efforts. Staff requested Board awards for contracts related to the DL&W Station, DL&W Roof Rehabilitation, and Lafayette Square Station. No formal votes were recorded in the minutes.
- Requested Board award construction contract Change Order No. 11 to Cerrone (DL&W Station)
- Requested Board award consultant Supplemental Agreement No. 3 to Mott MacDonald (DL&W Station)
- Requested Board award construction contract to Patterson-Stevens (DL&W Roof Rehabilitation)
- Requested Board award design contract to WSP (Lafayette Square Station Rehabilitation)
Audit, Governance and Finance
The Audit, Governance and Finance Committee is reviewing the 2025 Annual Audit Plan and financial performance reports for October 2024. The body is also discussing the FYE 2026 budget and reports on safety, government affairs, and human resources.
- 2025 Annual Audit Plan totaling 4,460 audit hours
- Buy America/Contract audits for New Flyer buses and BNIA Runway 5-23 Project Phase 2
- October 2024 net surplus of $2,070,000 compared to budget of $1,626,000
- Year-to-date October 2024 net surplus of $10,515,000
- FYE 2026 budget discussion
The committee reviewed a tentative balanced budget for FYE 2026 and the 2025 Annual Audit Plan. Financial reports showed a positive budget variance of $3,032,000 year-to-date through October. No formal votes were recorded during this committee meeting; items were presented for later Board approval.
- Presented FYE 2026 balanced budget of $310.5 million for Board approval
- Reviewed 2025 Annual Audit Plan totaling 4,460 scheduled hours
- Reported October budget variance of $445,000 (positive)
- Reported October YTD budget variance of $3,032,000 (positive)
- Reported total cash of $324,396,000 as of October end
Regular
The Niagara Frontier Transportation Authority board meets December 12 to adopt operating and capital budgets totaling $310.5 million for fiscal year 2025/26 and to vote on eight corporate resolutions including grants, change orders, service agreements, and a lease. The meeting also includes aviation and surface-transportation business group reports on projects and contracts.
- Adopt Operating and Capital Budgets, NFTA and Metro, FY2025/26 ($310.5M)
- Authorize NYSDOT Urban Master Grant Agreement, Contract No. K007557
- Authorize New York State Office of Parks EPF Contract #228147
- Authorize Change Order, ClearSky Consulting, Infor Support Services, NFTA
- Authorize Agreement, Metalico Buffalo, Inc., Metal Recycling Services, NFTA and Metro
The Board approved the consolidated operating and capital budgets for the fiscal year ending March 31, 2026. The budget includes a $35 million increase in revenues and a $37.9 million decrease in operating assistance, while maintaining the $2.00 Metro base fare. Several infrastructure and service contracts for aviation and surface transportation were also authorized.
- Adopted FY 2025/2026 consolidated budget of $310.5M (7-0)
- Approved $12.4M construction contract to Rifenburg Construction for BNIA Taxiway A Improvements (7-0)
- Approved $2.15M roof rehabilitation contract for DL&W Station to Patterson-Stevens, Inc. (7-0)
- Authorized $12.1M NYSDOT Urban Master Grant Agreement for various transit projects (7-0)
- Adopted Aviation Strategic Plan for BNIA and NFIA (7-0)
- Approved $1.48M elevator and escalator maintenance agreement with D.C.B. Elevator Co. (7-0)
- Increased BNIA Premium Parking Rate from $3,500 to $4,200 annually (7-0)
- Authorized $794,080 in sole source bus part purchases from five suppliers (7-0)
Aviation
The NFTA Aviation Committee will hear updates on major Buffalo Niagara International Airport projects including runway rehabilitation, terminal HVAC and power upgrades, passenger boarding bridge replacements, and a new sunflower program to assist travelers with non-visible disabilities. The meeting will also discuss financial performance and future planning initiatives.
- Award Phase 3 Runway 05-23 rehabilitation contract to Rifenburg Construction ($50.9M)
- Approve HVAC replacement contract for terminal roof top units ($7.3M)
- Advance Passenger Boarding Bridge replacements at Gates 8 & 22 (NYSDOT funded)
- Launch Hidden Disabilities Sunflower Program with lanyards and training for staff
- Review October 2024 operating revenues ($8.3M) and maintenance spending ($1.0M)
The committee received updates on runway and fence projects at BNIA and signage completion at IAG. Staff requested board awards for Taxiway A rehabilitation contracts. No formal votes were recorded in the minutes.
- Requested board award contract to Rifenburg Construction for BNIA Taxiway A Phase III
- Requested board award CM/Design Support to DiDonato & Associates for BNIA Taxiway A Phase III
Regular
The Niagara Frontier Transportation Authority board will review corporate, aviation, and surface transportation reports. The body is deciding on several procurement contracts, lease agreements, and design service awards for regional transit and airport infrastructure.
- Consultation Services Agreement with Gartner, Inc. for ERP-EAM Software Replacement Phase 2 for $1,593,296.00
- Purchase of six Cisco 9300 Network Switches from Zunesis for $243,360.58
- Lease agreements for The MTC Café (181 Ellicott Street), Geocove Inc. (247 Cayuga Road), and rprt, LLC (247 Cayuga Road)
- Design services contracts for LRRT awarded to Mott MacDonald NY, Inc. and Colliers Engineering & Design
- Aviation agreements for baggage control systems (Brock Solutions US Systems, LLC) and a John Deere Wheel Loader (Five Star Equipment, Inc.)
The Board unanimously approved 13 resolutions covering software replacements, airport infrastructure, and transit design services. Key actions included awarding design contracts for the LRRT and DL&W Riverwalk and approving several commercial lease agreements.
- Approved $1.59M agreement with Gartner, Inc. for ERP-EAM software replacement (Unanimous)
- Approved $243,360.58 purchase of six Cisco network switches from Zunesis (Unanimous)
- Approved 5-year lease with Grab and Go Shop, Inc. for MTC Café (Unanimous)
- Approved lease agreements for Geocove Inc. and rprt, LLC at 247 Cayuga Road (Unanimous)
- Approved $481,000 baggage control systems support agreement with Brock Solutions (Unanimous)
- Approved $2.8M stormwater and wetland maintenance contract with J.A. Brundage (Unanimous)
- Approved $320,000 purchase of a John Deere Wheel Loader for BNIA (Unanimous)
- Approved $515,223 LRRT design contract to Mott MacDonald NY, Inc. (Unanimous)
Surface Transportation
The Surface Transportation Committee meets to discuss winter preparedness plans, capital project updates including the DL&W Station and Bailey Avenue BRT, financial performance for September 2024, and performance metrics like farebox recovery and on-time service.
- NFTA-Metro winter preparedness plan: snow removal contracts, salt reserves, and Code Blue coordination
- Bailey Avenue BRT project advances with $102.7M federal grant for design and construction
- DL&W Station project construction underway with completion expected spring 2025
- September 2024 revenues $111K favorable vs. budget, including $56K higher passenger fares
- Farebox recovery ratio: Bus 24.1%, Paratransit 4.9%, Rail 12.1% for September
The committee received reports on winter preparedness, financial performance, and transit police activity. No formal votes or decisions were recorded during the meeting.
Audit, Governance and Finance
The NFTA Audit, Governance and Finance Committee receives updates on multiple audits of transit contracts, quarterly capital projects, cash management, safety, workers’ compensation, and grants. The meeting covers compliance reviews for federal funds, revenue audits of airport concessions, and quarterly performance reports for the NFTA/METRO system.
- Post-delivery Buy America audit of $16.5M New Flyer battery-electric bus purchase (report due Nov 2024)
- Post-delivery Buy America audit of $7.1M Nova Bus transit bus purchase (report issued Oct 2024)
- Revenue audit of airport rental car agencies at BNIA and NFIA (fieldwork through Nov 2024)
- Quarterly capital project report with completed project analysis
- $1.9M net surplus reported for September 2024 vs. $1.4M budget
The committee reviewed financial performance, audit statuses, and grant updates. No formal votes or policy decisions were recorded during the meeting.
Aviation
The committee is reviewing the status of multiple construction projects at Buffalo Niagara International Airport (BNIA) and Niagara Falls International Airport (NFIA). Discussions include a new Airport System Strategic Plan and proposals to increase parking and rental car capacity.
- Runway 05-23 Rehabilitation: Phase 1 complete; Phase 2 is 80% complete; Phase 3 is out for bid
- Passenger Boarding Bridge Replacements: 14 bridges to be replaced over 6 years
- Luiz Kahl Way Rehabilitation: 2.6-mile road project with potential electric vehicle charging
- Terminal HVAC Replacement: $7.0M grant awarded for equipment replacement
- NFIA Tower Replacement: Siting study underway to replace the existing control tower
The committee received progress reports on airfield construction and security projects at BNIA and IAG. Members reviewed a summary briefing on the Airport System Strategic Plan and a financial report showing increased enplanements and revenues at BUF.
Surface Transportation
The NFTA Surface Transportation Committee meets to discuss Metro’s financial performance, passenger information systems, capital projects, and public safety. The committee reviews August 2024 financials, performance metrics, and updates on initiatives like Battery Electric Bus deployment and paratransit service improvements.
- Passenger Fares revenue down $108K (6.0%) in August; up $846K (8.4%) year-to-date
- Bailey Avenue Bus Rapid Transit project awarded $102.7M USDOT grant
- Battery Electric Bus deployment advancing with 45 buses expected at Cold Spring Station by end of 2025
- DL&W Rail Station project construction underway with completion expected by spring 2025
- Passenger Information Systems overhaul to revamp timetables and provide real-time data via third-party apps
The committee meeting consisted of staff presentations and reports. No formal votes or decisions were recorded in the minutes.
Aviation
The committee is discussing updates to the Buffalo Niagara International Airport (BNIA) and Niagara Falls International Airport (NFIA). Key topics include the progress of runway and terminal rehabilitations and a proposal to implement a Customer Facility Charge (CFC) for rental car users.
- Runway 05-23 Rehabilitation: Phase 1 complete; Phase 2 paving on schedule for end of September
- Passenger Boarding Bridge Replacements: 14 bridges to be replaced over 6 years; RFP for Gates 8 & 22 due mid-October 2024
- Terminal Standby Power Expansion: Construction contract award requested for The State Group
- Terminal HVAC Replacement: $7.0M grant awarded; first unit anticipated April 2025
- Proposed Customer Facility Charge (CFC): User fee on rental car transactions to fund facility upgrades
The committee received updates on airfield projects at BNIA and IAG and a presentation on Consolidated Facility Charges. Financial reports indicated increased enplanements and operating revenues for BUF. No formal votes or decisions were recorded during the meeting.
Audit, Governance and Finance
The Audit, Governance and Finance Committee is reviewing financial performance reports and the status of several internal audits. These include a compliance review of a $7,108,692 transit bus purchase and revenue audits for airport concessions and parking.
- Post-delivery Buy America audit for 10 Nova Bus transit buses costing $7,108,692
- Revenue audits for rental car agencies at BNIA and NFIA
- Revenue audit for Delaware North Companies Travel Hospitality Services, Inc. concessions at BNIA
- Revenue audit for Executive Flight Services, LLC hangar and office leases at BNIA
- Revenue audit for SP Plus Corporation parking and shuttle services at BNIA and NFIA
The committee received reports on August financial variances, safety metrics, and federal grant awards. Staff recommended board approval for a $3.7 million state matching funds contract and a three-year labor agreement with Teamsters Local 264T.
- Proposed $3.7M NYS DOT matching funds contract for FTA formula grants
- Proposed ratification of three-year agreement with Teamsters Local 264T
- Proposed adoption of Triennial Title VI Program Plan Update
Regular
The Niagara Frontier Transportation Authority will review corporate, aviation, and surface transportation resolutions. Key items include funding for infrastructure, vehicle procurement, and collective bargaining agreements.
- NYSDOT Urban Master Grant Agreement (Contract No. K007557) for $3,676,738.00
- Procurement of eight battery electric buses from New Flyer of America, Inc.
- Procurement of six parking shuttles from Coach and Equipment Bus Sales, Inc. for BNIA
- Collective Bargaining Agreement with Teamsters 264T
- Roof rehabilitation (Phase IV) at 485 Cayuga Road with Grove Roofing
The Board approved several high-value procurements, including eight battery electric buses and a new aircraft rescue firefighting truck. It also authorized various infrastructure design contracts for the light rail system and airport power expansion, and approved a new landing fee tariff for Buffalo Niagara International Airport.
- Approved procurement of 8 battery electric buses from New Flyer of America, Inc. for $10,262,665.86
- Approved non-competitive purchase of one Oshkosh ARFF truck from Firematic Supply Co., Inc. for $1,495,000.00
- Approved $1.15M contract with The State Group USA LTD for passenger terminal standby power expansion at BNIA
- Approved landing fee tariff of $6.31 per 1,000 lbs GCLW for signatory carriers and $7.89 for non-signatory carriers
- Approved $840,800 agreement with Grove Roofing Services for roof rehabilitation at 485 Cayuga Road
- Approved $1.24M design agreement with Colliers Engineering & Design for LRRT standpipe replacement
- Approved $92,500 settlement payment in Margie S. Trotter v. NFTA
- Approved 20-year lease with Southgate Associates, LLC for Southgate Plaza transit center starting at $23,000 annually
Audit, Governance and Finance
The Audit, Governance and Finance Committee is reviewing the status of several ongoing revenue audits and corporate compliance reports. The body is also discussing June 2024 financial performance, which shows a net surplus of $2,398,000 against a budget of $170,000.
- Revenue audits in progress for Airport Rental Cars (BNIA & NFIA), Delaware North Companies Travel Hospitality Services, and Executive Flight Services, LLC
- Revenue audits in progress for SUNY Erie student bus passes and SP Plus Corporation parking/shuttle services
- Follow-up audit for Signature Aviation and interim audits for JE Architects/Engineers PC and Mott MacDonald NY Inc.
- June 2024 actual operating expenses of $18,851,000 compared to a budget of $21,405,000
- Year-to-date June 2024 net surplus of $5,856,000
The committee reviewed financial performance, audit statuses, and grant applications. Staff recommended the adoption of a three-year labor agreement and new Disadvantaged Business Enterprise participation goals for board approval.
- Proposed 3-year agreement for Teamsters Local 264M Metro-link ADA Controllers (pending board approval)
- Proposed 17% DBE participation goal for FTA-funded projects 2024-2027 (pending board approval)
- Proposed 16.9% DBE participation goal for NFIA FAA-funded projects 2024-2027 (pending board approval)
- Awarded $5.0M NYS DOT grant for 10 battery-electric buses and charging infrastructure
- Denied $3.5M NYS DOT funding request for Empire State Trail reconstruction
Surface Transportation
The Surface Transportation Committee is reviewing rail renewal progress, capital project updates, and June 2024 financial performance. The body is discussing the rehabilitation of the DL&W shoreline and several light rail station upgrades.
- USDOT grant of $102,692,562 for Bailey Avenue Bus Rapid Transit design and construction
- Grant funding of $30.0M for DL&W Rail Station general and arena egress improvements
- FHWA award of $6.6 million for the ITS4US accessible trip planning project
- DL&W Station completion date extended to January 2025 via Change Order No. 9
- June 2024 operating expenses were $1,860,000 (12.2%) favorable to budget
The committee received progress reports on the $50 million Rail Renewal campaign and the deployment of battery electric buses. Staff requested Board awards for contracts regarding the DL&W Station, bus wash replacements, and Metro Transportation Center enhancements.
- Staff requested Board award Cerrone Change Order No. 9 for DL&W Station construction
- Staff requested Board award Greenway construction contract for bus wash replacements
- Staff requested Board award Wendel design contract for Metro Transportation Center exterior enhancements
Regular
The Niagara Frontier Transportation Authority is meeting to review corporate, aviation, and surface transportation reports. The board will consider several lease agreements, labor contracts, and design service awards.
- Authorization for Collective Bargaining Agreement with Teamsters Local 264 for Metrolink ADA Controllers
- Design services contract awards to Wendel WD Architecture and McMahon & Mann Consulting Engineering and Geology
- Lease agreements for 247 Cayuga Road with Integrated Deicing Services LLC and J&G Merchandise
- Authorization to procure a John Deere Wheel Loader from Five Star Equipment, Inc. for NFIA
- Authorization for a bus wash replacement award to Greenway USA LLC
The Board approved several infrastructure projects, including MTC exterior enhancements and DL&W shoreline rehabilitation. It also authorized new lease agreements, a $70,000 legal settlement, and updated Disadvantaged Business Enterprise goals for 2025-2027.
- Approved $1.17M design contract for MTC Exterior Enhancements to Wendel WD Architecture (7-0)
- Approved $1.24M design contract for DL&W Shoreline Rehabilitation to McMahon & Mann (7-0)
- Approved $1.15M change order for Mark Cerrone Inc. regarding DL&W Station (7-0)
- Approved $940,000 bus wash replacement contract to Greenway USA LLC (7-0)
- Approved $70,000 settlement for Letia Commodore v. NFTA (7-0)
- Approved $160,497.66 software maintenance renewal with Hitachi Energy USA Inc. (7-0)
- Adopted 16.9% DBE goal for Niagara Falls International Airport and 17% for FTA projects (7-0)
- Approved $350,000 procurement of John Deere Wheel Loader for NFIA (7-0)
Aviation
The Aviation Committee is reviewing the status of several airport improvement projects, including runway rehabilitation and passenger bridge replacements. The body is also discussing a transition from AFFF to fluorine-free firefighting foam and reviewing June 2024 financial performance.
- Runway 05-23 Phase 2 construction including a two-month closure starting August 1st
- Replacement of 14 Passenger Boarding Bridges, with Gates 14, 20, and 3 due by April 1, 2025
- Rehabilitation of 2.6 miles of Luiz Kahl Way circulatory road
- Replacement of four terminal HVAC roof top units using a $7.0M grant
- Proposed $350 million federal grant program for firefighting foam transition and disposal
The committee received updates on runway and boarding bridge projects at BNIA and signage installation at IAG. Members discussed a mandated transition to fluorine-free firefighting foam and reviewed increased enplanement and revenue figures for BUF and IAG.
Audit, Governance and Finance
Lumsden & McCormick LLP issued an unmodified clean opinion for the 2024 audit with no material weaknesses or findings. The committee also reviewed May 2024 financial performance, which showed a positive budget variance of $2,343,000.
- Received unmodified clean audit opinion for year ended March 31, 2024
- Proposed three-year agreement with Teamsters Local 264A (pending Board approval)
- Proposed three-year agreement with EVERFI for employee training (pending Board approval)
- Proposed amendment to workplace drug and alcohol policy (pending Board approval)
Aviation
The committee received updates on airfield infrastructure projects and air service development. No formal votes or decisions were recorded during the meeting.
Surface Transportation
The committee received updates on rail station rehabilitations, bus ridership trends, and transit police activity. No formal votes or policy decisions were recorded during the meeting.
Regular
The Board approved several corporate and aviation contracts, including a security fence replacement at BNIA and a new collective bargaining agreement for airport supervisors. The Authority also adopted an amended Drug and Alcohol Policy to comply with federal and state regulations. Financial statements for the fiscal year ending March 31, 2024, were formally accepted.
- Approved $1.5M contract to Woodsmith Fence Corp. for BNIA security fence replacement (Unanimous)
- Adopted amended Drug and Alcohol Policy to remove marijuana from prohibited drugs for non-safety sensitive positions (Unanimous)
- Approved 3-year collective bargaining agreement for Teamsters Local 264 Airport Supervisors (Unanimous)
- Approved financial statements for fiscal year ending March 31, 2024 (Unanimous)
- Authorized $81,000 NYSDOT Section 5311 Operating Assistance for non-urbanized areas (Unanimous)
- Approved $237,689.76 procurement for Splunk software from Carahsoft (Unanimous)
- Approved $166,972.59 purchase of 25 Cisco network switches from Zunesis (Unanimous)
- Authorized amended agreement with Buffalo Niagara Medical Campus, Inc. for ITS4US program not to exceed $6,675,101 (5-0-2)
Audit, Governance and Finance
The committee received reports on April's budget variance, capital project spending, and workplace safety. Staff presented updates on pending audits and the receipt of a $290,000 law enforcement grant. No formal votes were recorded in the minutes.
Aviation
The committee received updates on runway and boarding bridge projects and a presentation on drone detection. Financial reports showed Buffalo Niagara International Airport revenue and enplanements increased in April 2024 compared to April 2023.
- Requested board award construction contract for salt storage building to Hybrid Solutions
Surface Transportation
The committee received reports on the Transit Development Plan, financial performance, and capital project statuses. No formal votes or decisions were recorded during the meeting.
Regular
The Board approved a series of agreements including a $925,000 software replacement project, a new salt barn for BNIA, and roadway repairs for Metro. Other actions included approving a five-year collective bargaining agreement for Assistant Fire Chiefs and several airport and transit-related leases.
- Approved $925,000 agreement with Gartner, Inc. for ERP-EAM Software Replacement
- Approved 5-year collective bargaining agreement for Assistant Fire Chiefs Association
- Approved $672,346.20 contract with Hybrid Building Solutions, LLC for BNIA salt barn
- Approved $175,752.40 contract with Milherst Construction, Inc. for Metro roadway repairs
- Approved $364,100.13 change order for Mark Cerrone, Inc. regarding DL&W Station
- Approved agreement with Greystone Management Solutions for real estate advisory services
- Approved $413,700 estimated 5-year agreement with Braunscheidel LGS, Inc. for BNIA mulching
- Approved license agreement for IRace Timing, LLC to hold Run the Runway 5K at NFIA
Annual Regular
The Board approved several operational agreements, including waste disposal, safety footwear, and rail car wheel procurement. It also adopted updated corporate policies regarding ethics, harassment, and procurement guidelines, and authorized a $75,000 legal settlement.
- Approved $1.63M waste and recycling contract with Casella Waste Systems, Inc. (unanimous)
- Approved $143,750 annual safety footwear procurement with Saf-Gard Safety Shoe Company (unanimous)
- Approved $2.47M traction motor overhaul agreement with Swiger Coil Systems, Inc. (unanimous)
- Approved $179,926.60 agreement with UTCRAS LLC for 140 rail car wheels (unanimous)
- Authorized $75,000 settlement for Reuben Carawan v. Niagara Frontier Transit Metro System, Inc. (unanimous)
- Approved $604,262 agreement with City of Niagara Falls for seasonal trolley service (unanimous)
- Approved $150,000 agreement with Arcadis Architects for NITTEC ATMS support (unanimous)
- Authorized $273,585 agreement with Transpo Group USA, Inc. for GBNRTC travel modeling (unanimous)
Aviation
The Aviation Committee met to receive updates on airport infrastructure and financial performance. No formal votes or policy decisions were recorded; the session focused on project timelines for BNIA and IAG.
- Reported BNIA Runway 05-23 will be fully closed from August 1 to September 30
- Reported terminal carpet replacements will cost $350k per year for two years
- Reported 14 jet bridges to be replaced over a 6-year period using NYS DOT and Federal BIL funds
- Reported IAG airfield illuminated signage replacement to be completed by December 2024
- Confirmed no changes to this year's Aviation Committee Charter
Human Resources
The committee received reports on employee turnover, recruitment initiatives for mechanical positions, and the status of labor contracts. No formal votes or policy changes were recorded in the minutes.
Audit, Governance and Finance
The committee received reports on FYE 2024 preliminary financials, safety metrics, and insurance premiums. No formal votes were recorded for the proposed charter change or the designation of the financial expert.
- Proposed adding 'Grants and Development' report to the Audit, Governance and Finance Committee Charter
- Announced Commissioner Baynes agreed to serve as the financial expert for the committee
Surface Transportation
The committee received progress reports on the DL&W Station construction and public art projects. Staff provided updates on Metro capital projects, including bus garage sprinkler replacements and chiller installation at the Metro Transportation Center. No formal votes or policy changes were recorded.
- Surface Transportation Committee Charter Review: No changes made
Regular
The Board approved revised operating and capital budgets for FY 2024/2025 and adopted five-year financial plans through March 31, 2029. Multiple corporate, aviation, and surface transportation contracts were authorized, including a major rail station rehabilitation project. The Board also approved a fare reciprocity pilot program with Niagara County.
- Adopted Revised FY 2024/2025 Operating and Capital Budgets (7-0)
- Adopted Five Year Operating and Capital Plans through March 31, 2029 (7-0)
- Approved $5,003,863.28 construction contract to Greenway USA, LLC for Church Street Station Rehabilitation (7-0)
- Approved $602,808.92 monitoring contract to Fennick McCredie Architecture for Church Street Station (7-0)
- Authorized fare reciprocity pilot program with Niagara County Connect Niagara (7-0)
- Approved $150,000 settlement for Colleen K. Mattrey v. NFTA (7-0)
- Authorized $343,050 construction monitoring contract to C&S Companies for NFIA airfield signage (7-0)
- Approved procurement of three Ford Explorer police vehicles from DeLacy Ford for $135,998.40 (7-0)
Surface Transportation
The committee reviewed paratransit survey results and capital project updates. No formal votes or decisions were recorded during the meeting.