The Louisiana Engineers Selection Board is meeting to consider applications for engineering services on six state facility projects, including electrical upgrades, HVAC replacements, and lighting improvements. The board will select designers for projects at locations such as the State Capitol Park, Fletcher Technical Community College, and Northwestern State University. The meeting is scheduled for October 12, 2022.
- Electrical upgrades at State Capitol Park's South Central Plant, Baton Rouge, with $1.1M construction funds
- HVAC equipment replacement at Fletcher Technical Community College, Thibodaux, with $1.1M construction funds
- HVAC components replacement at University of Louisiana Monroe Library, with $813,646 construction funds
- Elevator repair and ADA upgrade at Agnes Edwards Hall, University of Louisiana Lafayette, with $600,000 construction funds
- LED sports lighting replacement at Turpin Stadium, Northwestern State University, Natchitoches, with $550,000 construction funds
The Board selected firms for electrical, HVAC, and lighting projects across several state facilities. One contract was decided by a coin toss after repeated tie votes. No applications were received for the elevator project at Agnes Edwards Hall.
- Awarded State Capitol Park electrical upgrades to Nesbit & Associates, LLC
- Awarded Fletcher Technical Community College HVAC replacement to YKH Consulting, LLC
- Awarded University of Louisiana - Monroe HVAC replacement to John J. Guth Associates, Inc.
- Awarded Northwest Louisiana Technical College HVAC replacement to John J. Guth Associates, Inc.
- Awarded Northwestern State University lighting replacement to Associated Design Group, Inc. (via coin toss)
- Adopted July 13, 2022 minutes
- Deferred Agnes Edwards Hall elevator repair to the November 16, 2022 Architects Selection Board Meeting
Engineers Selection Board
The Louisiana Engineering Selection Board is accepting applications for engineering services on five capital projects, including drainage, electrical, plumbing, road repairs, and HVAC replacement. The board will meet on July 13, 2022, to select designers for these projects. Total available construction funds across all projects are approximately $4.8 million.
- Esler Field Sub-Surface Drainage, Pineville, LA — $1.7M construction, $135K designer fee
- Electrical Infrastructure Resiliency, Grambling State University — $1.25M construction, $102K fee
- Foundation and Underslab Plumbing Repairs, Grambling State University — $750K construction, $70K fee
- Sherman Drive Repairs, Jackson Barracks, New Orleans — $750K construction, $64K fee
- Replacement of HVAC Equipment, South Louisiana Community College, New Iberia — $593K construction, $44K fee
The Louisiana Engineers Selection Board awarded design contracts for drainage, electrical, plumbing, road, and HVAC projects. One contract was decided by a coin toss after a tie in voting.
- Awarded Esler Field Sub-Surface Drainage contract to Meyer, Meyer, LaCroix & Hixson, Inc.
- Awarded Grambling State University Electrical Infrastructure Resiliency and Improvement contract to Forte & Tablada, Inc.
- Awarded Grambling State University Foundation and Underslab Plumbing Repairs contract to M & E Consulting, Inc.
- Awarded Jackson Barracks Sherman Drive Repairs contract to Meyer Engineers, Ltd.
- Awarded South Louisiana Community College HVAC Equipment Replacement contract to Marrero, Couvillon & Associates, LLC via coin toss
- Adopted April 20, 2022 minutes
Engineers Selection Board
The Engineers Selection Board is accepting applications for engineering services across nine different projects. These projects include infrastructure repairs, electrical upgrades, and HVAC replacements at various state facilities.
- SOWELA Technical Community College parking lot resurfacing: $4,000,000 construction funds, $104,495 fee
- Camp Beauregard Road Network Rehabilitation: $2,900,000 construction funds, $144,119 fee
- Baton Rouge Community College chiller and cooling tower replacements: $2,100,000 construction funds, $73,451 fee
- Bogue Chitto State Park emergency erosion repairs: $1,825,000 construction funds, $86,760 fee
- Louisiana Tech University chiller replacements: $970,000 construction funds, $68,735 fee
The Board approved the January 12, 2022 minutes and selected design firms for nine infrastructure and facility projects across Louisiana. These projects include campus parking, road rehabilitation, and utility replacements.
- Selected Forte & Tablada, Inc. for SOWELA Technical Community College campus parking resurfacing
- Awarded Road Network Rehabilitation at Camp Beauregard to Pan American Engineers-Alexandria
- Awarded Baton Rouge Community College chiller and cooling tower replacements to Eyre Engineering, LLC
- Selected Meyer Engineers, Ltd. for Bogue Chitto State Park emergency erosion repairs
- Awarded Louisiana Tech University chiller replacements to John J. Guth Associates, Inc. by unanimous vote
- Selected Pond & Company, Inc. for Camp Beauregard On-Post Distribution Resiliency Project
- Awarded Bridge City Center for Youth plumbing and hot water infrastructure repairs to Salas O’Brien, LLC
- Awarded LSU Shreveport high-voltage system grid replacement to Estes, McClure & Associates, Inc. (EMA)
Engineers Selection Board
The Engineers Selection Board is accepting applications for design services for storm water, cooling, HVAC, and road projects at various Louisiana campuses. The board will meet on January 12, 2022, to consider applicants.
- LSU Health Sciences Center New Orleans: Storm Water Infrastructure Upgrades ($2,500,000 construction funds; $231,928 fee)
- Baton Rouge Community College: Campus-wide Chillers and Cooling Tower Replacements ($2,100,000 construction funds; $76,614 fee)
- Northwest Louisiana Technical Community College: Building A HVAC Replacements ($776,000 construction funds; $58,402 fee)
- Southern University Baton Rouge: Drainage Repair & Road Overlay ($660,000 construction funds; $59,237 fee)
The Board selected designers for storm water, chiller, HVAC, and drainage projects. Three firms were selected via voting, and one was determined by a coin toss after multiple tie-breaker ballots.
- Awarded LSU Health Sciences Center storm water project to CSRS, LLC via coin toss
- Awarded Baton Rouge Community College chiller project to ADG Baton Rouge, LLC
- Awarded NLTCC HVAC replacements project to John J. Guth Associates, Inc.
- Awarded Southern University drainage and road project to Professional Engineering Consultants Corporation
- Re-elected Ali Mustapha as chairperson
- Elected Warren Hull as vice chairperson