Washington Utilities and Transportation Commission public meetings in 2025
24 substantive meetings from 2025, with official agendas or minutes and plain-English summaries.
Open Meeting
The Washington Utilities and Transportation Commission is meeting to consider multiple utility tariff revisions, including rate increases for water and electricity, and decreases for some riders. The agenda includes a significant Puget Sound Energy power cost adjustment that would raise typical residential bills by $28.04 per month, and several garbage collection rate increases due to higher disposal fees. The meeting also includes consent items for garbage rate adjustments and a discussion of conservation plans scheduled for a later date.
- PSE Power Cost Adjustment (UE-250747): typical residential bill increase of $28.04/month (20.27%)
- PSE Greenhouse Gas Cap and Invest (UE-250901): typical residential bill decrease of $10.08/month (7.29%)
- Avista Colstrip Tracker (UE-250856): typical residential bill decrease of $10.65/month (8.4%)
- PSE Gas GHG Cap and Invest (UG-250843): revenue increase of $64.5M, residential bill increase of $5.24/month (5.31%)
- Lakeland Village Water rate increase (UW-250790): $244,000 (74%) additional annual revenue
The Washington Utilities and Transportation Commission approved multiple Puget Sound Energy (PSE) tariff revisions, including a power cost adjustment that will increase typical residential electric bills by $28.04 per month (20.27%) and a greenhouse gas adjustment that will decrease them by $10.08 per month (7.29%), both effective January 1, 2026. The Commission also approved a 25% increase to the top band of the Household Goods tariff and initiated a rulemaking to revise industry rules. Additionally, the Commission accepted biennial conservation plan targets for PacifiCorp, PSE, Avista, Cascade Natural Gas, and Northwest Natural Gas, and approved a water rate increase for J. Renee – Bo-Ginn, L.L.C. while taking no action on Lakeland Village Water Company's rate request, allowing it to go into effect by operation of law.
- Approved PSE Power Cost Adjustment tariff, raising typical residential electric bills by $28.04/month (3-0)
- Approved PSE Greenhouse Gas Emissions Cap and Invest Adjustment tariff, lowering typical residential electric bills by $10.08/month (3-0)
- Approved PSE natural gas Schedule 111 tariff, increasing revenue requirement by $64.5M with low-income credit (3-0)
- Approved 25% increase to Household Goods tariff top band and initiated rulemaking (3-0)
- Accepted conservation plan targets for PacifiCorp, PSE, Avista, Cascade Natural Gas, and Northwest Natural Gas (3-0 each)
- Approved J. Renee – Bo-Ginn water rate increase generating ~$1,700 additional annual revenue (3-0)
- Took no action on Lakeland Village Water Company rate request, allowing rates to take effect by operation of law
- Approved consent agenda (3-0)
- Tariff Revision
- Tariff Revision
- Staff Investigation
- Tariff Revision
- Tariff Revision
- Tariff Revision
- Tariff Revision
- Tariff Revision
Open Meeting
The Washington Utilities and Transportation Commission will consider several utility tariff revisions and petitions at its Dec. 11, 2025 open meeting. Key items include PacifiCorp's proposal to replace its net metering schedule with a new net billing service, Puget Sound Energy's request to extend time-of-use rates after a pilot, and a petition to deploy a thermal energy network pilot. The commission will also act on garbage rate increases for several companies and other transportation matters.
- PacifiCorp tariff UE-250695: new Schedule 138 Net Billing Service, closes Schedule 135 to new applications, adds Equitable Access Credit for income-qualified customers
- Puget Sound Energy UE-250725: extends Time-of-Use tariff for certain customers after pilot ends Sept 30, 2025, until full residential TOU in early 2027
- Puget Sound Energy UG-250455: petition to deploy a thermal energy network pilot project
- Ada-Lin Waste Systems TG-250789: rate increase generating ~$3,200 (1.6%) annually due to Spokane disposal fee hikes
- Rabanco Ltd TG-250917: rate increase generating ~$1,179,000 (14.9%) annually due to Snohomish County disposal fee hikes
- Petition
- Tariff Revision
- Tariff Revision
- Petition
- Petition
- Petition for Exemption
- Tariff Revision
- Staff Investigation
Open Meeting
The Washington Utilities and Transportation Commission will discuss utility tariff revisions, including PacifiCorp's transition from net metering to net billing, Puget Sound Energy's time-of-use tariff changes, and Cascade Natural Gas's refund for overcollected revenues. The meeting also includes consent items for rate increases due to B&O tax changes and other routine matters.
- PacifiCorp proposes Schedule 138 Net Billing Service, closing Schedule 135 to new applications and introducing Equitable Access Credit
- Puget Sound Energy seeks tariff changes for Time-of-Use services after pilot, with full rollout pending 2026 rate case
- Cascade Natural Gas refunds $731,884 overcollection via temporary credit from Dec 2025 to Nov 2026
- Basin Disposal and others request rate increases due to B&O tax hike from 1.75% to 2.10%
- Nooksack Valley Disposal proposes $0.27/month increase for recycling customers
The Washington Utilities and Transportation Commission approved the consent agenda (3-0) and issued a letter acknowledging Cascade Natural Gas's 2024 plant report as prudent. It took no action on Cascade's tariff revision, allowing a $731,884 customer refund to take effect by operation of law. Several items were moved to future meetings.
- Approved consent agenda (3-0)
- Approved letter acknowledging Cascade Natural Gas 2024 plant report as prudent (3-0)
- Took no action on Cascade Natural Gas tariff revision, allowing $731,884 refund to take effect by operation of law
- Moved PacifiCorp net billing item to December 11, 2025 meeting
- Moved Puget Sound Energy time-of-use tariff item to December 11, 2025 meeting
- Moved Puget Sound Energy power cost update to December 23, 2025 meeting
- Tariff Revision
- Tariff Revision
- Tariff Revision
- Tariff Revision
- Eligible Telecommunications Carrier
- Tariff Revision
- Plan
- Tariff Revision
Open Meeting
The Washington Utilities and Transportation Commission is meeting to review a tariff revision by Avista Corporation related to the Climate Commitment Act. The agenda also includes a consent item for a new depreciation rate for Cascade Natural Gas Corporation, effective retroactively to January 1, 2025. Several other items, including low-income program changes for Puget Sound Energy, are listed as 'No Action' or scheduled for a subsequent meeting on November 7.
- Avista Corporation revises Tariff WN U-29, Schedule 162, and Schedule 163 for Climate Commitment Act compliance (Docket UG-250663).
- Cascade Natural Gas Corporation petition for an Accounting Order with new depreciation rates retroactive to January 1, 2025 (Docket UG-250198).
- BNSF Railway Co. petition for exemption from clearance rules for an engine wash rack at the Interbay Yard in Seattle (Docket TR-250770).
- Puget Sound Energy introduces the Head Start Benefit (HSB) to provide bill credits to eligible customers with arrearages (Dockets UE-250755, UG-250756).
- Consolidated Communications Enterprise Services, LLC changes its name to Fidium Enterprise Services, LLC (Docket UT-250766).
The Commission approved the consent agenda and issued an order in docket UG-250663 requiring Avista Corporation to refile its proposed Climate Commitment Act tariff revisions with specific conditions, including renaming the new schedule, setting an expiration date, and modifying benefit calculations. The motion carried 3-0. No transportation or other items were on the agenda.
- Approved consent agenda (3-0)
- Ordered Avista to refile tariff revisions with conditions (3-0)
- Required new Schedule 164 with expiration date of October 31, 2026
- Mandated CCA benefit allocation changes for Schedules 111, 112, 116, 131, 132, and 146
- Directed residual benefit returns for Schedules 162 and 163 with lump-sum adjustments
- Required Avista to develop a low-income pilot program starting in 2026
- Tariff Revision
- Plan
- Petition for Accounting Order
- Petition for Exemption
Open Meeting
The Washington Utilities and Transportation Commission is reviewing a large batch of utility rate filings, most of which take effect on November 1, 2025. The agenda includes significant bill decreases for natural gas customers due to lower commodity costs, alongside smaller adjustments for electric and waste services. The Commission will also vote on consent items regarding clean energy reporting and transportation infrastructure projects.
- Cascade Natural Gas: $16.15 monthly decrease (15.5%) for average residential gas customers
- Puget Sound Energy: $4.02 monthly decrease (3.9%) for average residential gas customers
- Avista Corporation: $6.32 monthly decrease (6.6%) for average residential gas customers
- Waste Management of Washington: $0.65 monthly increase for residential recycling in Kitsap County
- WSDOT: Petition to construct a new overcrossing on State Route 9
The Washington Utilities and Transportation Commission approved a consent agenda and two utility items. It ordered Avista to refile its Climate Commitment Act tariff revisions with specific allocation rules, reducing average residential gas bills by $3.18/month. It also approved PacifiCorp's selection of London Economics International as an independent evaluator for its 2025 Washington RFP. Two informational presentations were heard for future meetings.
- Approved consent agenda (3-0)
- Ordered Avista to refile tariff revisions with CCA credit allocation rules (3-0)
- Approved PacifiCorp's independent evaluator London Economics International (3-0)
- Tariff Revision
- Tariff Revision
- Special Presentation
- Tariff Revision
- Plan
- Tariff Revision
- Petition
- Tariff Revision
Open Meeting
The Washington Utilities and Transportation Commission will vote on a petition to set the 911 state excise tax rate for calendar year 2026. The body will also consider accounting orders for Avista Corporation related to an Enterprise Resource Platform investment. Additionally, the Commission will approve a name change for a telecommunications company and extend authority for a town car service.
- Petition to set the 911 state excise tax rate for calendar year 2026 (UT-250689)
- Avista Corporation petitions for deferred accounting treatment of Enterprise Resource Platform costs (UE-250576, UG-250577)
- Dense Air Networks US, LLC notice of name change to IONX Networks US, LLC (UT-250700)
- Eagle Towncar Service LLC extension of authority certificate (TC-250609)
- Teleport Communications America, LLC petition to waive number utilization requirements for 10,000 sequential numbers (UT-250721)
The Washington Utilities and Transportation Commission unanimously approved Avista Corporation's petitions for deferred accounting and ratemaking treatment of costs related to its enterprise resource platform (ERP) investment, subject to specific conditions. The conditions include allowing deferral of undepreciated net book value of existing technology and minimal capital expenditures until the ERP go-live date, a 15-year depreciable life for implementation costs, denial of deferral for depreciation expenses, and deferral of cloud costs as a regulatory asset at actual after-tax cost of debt. The consent agenda was also approved unanimously. No substantive decisions were made on other items.
- Approved consent agenda (3-0)
- Granted Avista's petition for deferred accounting in docket UE-250576 (3-0)
- Granted Avista's petition for deferred accounting in docket UG-250577 (3-0)
- Allowed 15-year depreciable life for ERP implementation costs
- Denied deferral of depreciation expenses but allowed deferral of other project expenses
- Allowed deferral of ERP cloud costs as regulatory asset at after-tax cost of debt
- Plan
- Certificate
- Petition
- Telephone Number Resources
- Petition for Accounting Order
- Petition for Accounting Order
Open Meeting
The Washington Utilities and Transportation Commission will hold an open meeting to discuss and potentially decide on several utility rate and tariff items. Key items include Puget Sound Energy's request for a $26.8 million power cost adjustment, PacifiCorp's transition from net metering to net billing, and multiple solid waste rate increases due to a B&O tax change. The agenda also includes numerous consent items for recycling rate adjustments and tariff revisions.
- Puget Sound Energy seeks $26.8M annual power cost increase (0.8%) effective Oct 1, 2025
- PacifiCorp proposes Schedule 138 Net Billing Service, closing Schedule 135 to new applications
- Waste Management of Kennewick requests $1.13M (37%) annual garbage rate increase
- Basin Water Sources seeks $7.59/month surcharge for water system engineering assessment
- Multiple solid waste companies request rate increases due to B&O tax hike from 1.75% to 2.10%
The Washington Utilities and Transportation Commission approved Puget Sound Energy's annual power cost adjustment, increasing revenue by $26.8 million (0.8%) and raising a typical residential bill by $0.72 (0.5%) per month. The commission also granted deferred accounting for Canadian tariff costs to Avista, PSE, Cascade Natural Gas, and NW Natural, and approved a phased rate increase for Waste Management of Kennewick. Several items were moved to future meetings, including PacifiCorp's net billing tariff and PSE's low-income program tariff.
- Approved PSE power cost adjustment, $26.8M revenue increase (3-0)
- Granted Avista deferred accounting for Canadian tariffs (3-0)
- Granted PSE deferred accounting for Canadian tariffs (3-0)
- Granted Cascade Natural Gas deferred accounting for Canadian tariffs (3-0)
- Approved NW Natural conservation potential assessments (3-0)
- Approved Basin Water Sources surcharge, 70% recovery (3-0)
- Approved Waste Management Kennewick rate increase, phased (3-0)
- Approved PSE low-income program tariff, effective Oct 1 (3-0)
- Tariff Revision
- Petition
- Tariff Revision
- Tariff Revision
- Staff Investigation
- Tariff Revision
- Tariff Revision
- Staff Investigation
Open Meeting
The Washington Utilities and Transportation Commission is reviewing a request from PacifiCorp to increase residential power bills by an average of $15.77 per month, effective October 1, 2025. The agenda also includes discussions on the annual recertification of telecommunications carriers for federal high-cost support, which totaled $73 million in 2024. Additionally, the commission will consider a petition from NW Natural Gas regarding a thermal energy network pilot and a funding application from the Pend Oreille Valley Railroad.
- PacifiCorp requests approval for a net power cost revenue requirement increase of $59.5 million (10%) effective October 1, 2025.
- A typical residential ratepayer using 1,200 kWh would see a $15.77 (9.2%) monthly bill increase under the proposed PacifiCorp tariff revision.
- The commission must notify the FCC and Universal Service Administrative Company by October 1, 2025, regarding the annual review of federal high-cost telecommunications certifications.
- NW Natural Gas petitions for an order acknowledging its Thermal Energy Network Pilot Project and pursuit of grant funding.
- Pend Oreille Valley Railroad applies for funds from the Grade Crossing Protective Fund for a crossing project at SR-20.
The Washington Utilities and Transportation Commission approved PacifiCorp's annual power cost adjustment, allowing a $59.5 million revenue increase, but delayed the effective date to February 1, 2026, with a 12-month amortization. The commission also approved deferred accounting for PacifiCorp's insurance costs, accepted NW Natural's thermal energy network pilot, and declined to recertify several high-cost telecommunication carriers for 2026.
- Approved PacifiCorp power cost adjustment with $59.5M increase, effective Feb 1, 2026 (3-0)
- Approved PacifiCorp deferred accounting for insurance premiums (3-0)
- Approved PacifiCorp compliance filing for conditional-firm bridge transmission (3-0)
- Accepted NW Natural Gas thermal energy network pilot project (3-0)
- Declined to recertify 8 high-cost telecom carriers for 2026 (3-0)
- Certified 29 high-cost telecom carriers for 2026 federal support (3-0)
- Approved consent agenda (3-0)
- Petition
- Petition for Accounting Order
- Petition
- Petition
- Eligible Telecommunications Carrier
- Petition
- Petition
- Petition
Open Meeting
The Washington Utilities and Transportation Commission is holding an open meeting to discuss utility filings, including rate reports from Avista and Puget Sound Energy that do not affect customer rates, a petition from PacifiCorp for a waiver, and a discussion on low-income energy assistance funding. The meeting also includes a follow-up on federal policy impacts and a recessed item on Bonneville Power Administration's post-2028 Residential Exchange Program. Several consent items and no-action tariff revisions are on the agenda.
- PacifiCorp petition for partial waiver of WAC 480-107 and approval of 2025 Washington Situs RFP
- Discussion of low-income energy assistance funding under RCW 80.28.425(2)
- Pellegrini d/b/a Upper/Okanagan Valley Disposal requests extension for rate case filing to Nov 1, 2025
- Consent: Tacoma Rail petition for close clearance waiver for radiation detector at Schnitzer Steel
- No action: PacifiCorp tariff revision increasing annual revenue by $11.2 million (2.6%)
The Washington Utilities and Transportation Commission unanimously approved several utility filings, including Avista's and Puget Sound Energy's rate year reports, and PacifiCorp's request for a partial waiver to conduct a 2025 Washington Situs Request for Proposals, subject to conditions. The commission also voted to issue a policy statement on low-income energy assistance funding and extended a solid waste company's rate case filing deadline. Two items were informational only.
- Approved Avista's Rate Year 2 Provisional Capital Review Report (3-0)
- Approved Puget Sound Energy's 2024 Multi-Year Rate Plan Report (3-0)
- Approved PacifiCorp's petition for partial waiver and draft 2025 Washington Situs RFP with conditions (3-0)
- Approved issuing a policy statement on low-income energy assistance funding (3-0)
- Extended Pellegrini d/b/a Upper/Okanagan Valley Disposal's rate case filing deadline to Nov 1, 2025 (3-0)
- Approved consent agenda (3-0)
- Tariff Revision
- Tariff Revision
- Staff Investigation
- Tariff Revision
- Petition
- Staff Investigation
- Tariff Revision
- Petition
Open Meeting
The Washington Utilities and Transportation Commission is holding an open meeting to discuss utility tariff revisions, a staff investigation into federal policy impacts on investor-owned utilities, and several consent items including pipeline replacement plans and renewable portfolio standard reports. The agenda includes two utility tariff items for discussion and a recessed session on federal policy impacts, with the rest being routine consent or no-action items.
- PacifiCorp tariff revision for Low Income Bill Assistance Program (UE-250311)
- Puget Sound Energy tariff revision to eliminate deadband and sharing bands in Power Cost Adjustment (UE-250537)
- Staff investigation on impacts of new federal policies on Washington's investor-owned utilities (U-250534)
- Consent: 2025-2027 pipeline replacement plans for Avista, PSE, Cascade Natural Gas
- Consent: BNSF petitions to modify pedestrian crossing in Auburn and reconstruct undercrossing in Sedro Woolley
The Washington Utilities and Transportation Commission unanimously approved a consent agenda and a tariff revision for PacifiCorp's Low Income Bill Assistance program, requiring customer notice and revised tariff language. It also suspended Puget Sound Energy's Power Cost Adjustment filing for a hearing. No transportation or other items were on the agenda.
- Approved consent agenda (3-0)
- Approved PacifiCorp tariff revision with conditions, including customer notice by Aug 25, 2025 (3-0)
- Suspended Puget Sound Energy's Power Cost Adjustment filing and set for hearing (3-0)
- Tariff Revision
- Plan
- Staff Investigation
- Tariff Revision
- Staff Investigation
- Tariff Revision
- Plan
- Staff Investigation
Open Meeting
The Washington Utilities and Transportation Commission is reviewing a major rate increase for Puget Sound Energy to recover costs associated with the Washington Climate Commitment Act. The agenda also includes tariff revisions for PacifiCorp and multiple waste management companies regarding recycling fees and disposal costs. Additionally, the commission will consider accounting orders for the 2025 Participatory Funding Agreement for several utility providers.
- Puget Sound Energy proposes a $129.1 million revenue increase to recover greenhouse gas compliance costs, raising residential bills by $3.55 per month.
- PacifiCorp proposes a $5.6 million annual revenue increase for conservation and demand response costs, adding approximately $1.79 to residential monthly bills.
- Waste Management of Spokane proposes a $1.78 monthly increase for residential recycling customers in Spokane County.
- RABANCO LTD. proposes a $1.30 monthly decrease for residential recycling customers in Snohomish County.
- Avista Corporation seeks approval for deferred accounting of costs associated with the 2025 Participatory Funding Agreement.
- Tariff Revision
- Petition for Accounting Order
- Tariff Revision
- Petition for Accounting Order
- Tariff Revision
- Tariff Revision
- Petition for Accounting Order
- Tariff Revision
Open Meeting
The Washington Utilities and Transportation Commission will hold an open meeting to consider petitions from PacifiCorp, Puget Sound Energy, and Avista for approval of their demand and resource supply forecasts, as well as a request from U.S. Cellular to relinquish its ETC designation. The commission will also hear a presentation from Puget Sound Energy on its joint outreach plan and address several consent items, including annual pipeline safety fees and tariff revisions. No action items are listed for discussion.
- PacifiCorp 2026 demand and resource supply forecast petition (UE-220789)
- Puget Sound Energy 2025-2026 demand and resource supply forecast petition (UE-220797)
- U.S. Cellular voluntary relinquishment of high-cost and lifeline ETC designations (UT-250179)
- Annual Pipeline Safety Fees 2025-2026 (P-250231)
- Cascade Natural Gas request to operate Anacortes Lateral pipeline at 500 psig near buildings (PG-250369)
The Washington Utilities and Transportation Commission approved PacifiCorp's 2026 demand and resource supply forecast, conditioned on a possible revision if the inter-jurisdictional cost allocation methodology changes. It also approved Puget Sound Energy's revised 2025-2026 forecast, clarifying that approval does not imply prudency of resource selection. The commission granted U.S. Cellular's conditional relinquishment of high-cost ETC designations, effective upon the T-Mobile transaction closing. No transportation items were on the agenda.
- Approved PacifiCorp's 2026 demand and supply forecast with condition to revise if cost allocation methodology changes (3-0)
- Approved Puget Sound Energy's revised 2025-2026 demand and resource supply forecast (3-0)
- Granted conditional relinquishment of U.S. Cellular's high-cost ETC designations, contingent on T-Mobile closing (3-0)
- Approved consent agenda (3-0)
- Petition
- Tariff Revision
- Petition
- Petition
- Cessation of Service
- Tariff Revision
- Tariff Revision
- Petition for Exemption
Open Meeting
The Washington Utilities and Transportation Commission will consider Puget Sound Energy's request for a $200 million revenue increase to recover costs of complying with the Climate Commitment Act, which would raise average residential bills by $5.50 per month. The commission will also review rate increase requests for water and solid waste utilities, including Suncadia Water and Kent-Meridian Disposal, and hear petitions for thermal energy network pilot projects from three natural gas companies. Several items are consent agenda or no-action filings, including tariff changes and service cessations.
- PSE tariff revision (UE-250321) seeks $200M revenue increase for Climate Commitment Act compliance, raising average residential bill by $5.50/month
- Thermal energy network pilot project petitions from PSE, Cascade Natural Gas, and Northwest Natural Gas
- Suncadia Water rate increase request reduced to $396,319 (18.7%) for ~1,950 customers in Kittitas County
- Kent-Meridian Disposal rate increase of $1,074,310 (7.26%) for ~22,000 customers in King County
- Avista Energy Recovery Mechanism annual review with $14.9M surcharge and $34.9M balance amortization
The Washington Utilities and Transportation Commission approved the consent agenda (except item E2) and issued acknowledgement letters for three natural gas companies' thermal energy network pilot project petitions. It also suspended a water rate increase for East Side Improvement Co. and allowed several other rate changes to take effect by operation of law. Two items were rescheduled to later meetings.
- Approved consent agenda except item E2 (3-0)
- Issued acknowledgement letters for thermal energy network pilot petitions for Puget Sound Energy, Cascade Natural Gas, and NW Natural (3-0)
- Suspended East Side Improvement Co. water rate increase and set for hearing (3-0)
- Allowed Suncadia Water Company rate increase to take effect by operation of law
- Dismissed complaint against Kent-Meridian Disposal, allowing rate increase and requiring refund (3-0)
- Allowed RABANCO rate increase to take effect by operation of law
- Withdrawn: Suncadia Water Company accounting order petition (item E2)
- Petition
- Tariff Revision
- Petition for Accounting Order
- Petition
- Tariff Revision
- Petition
- Tariff Revision
- Tariff Revision
Open Meeting
The Washington Utilities and Transportation Commission is meeting to consider a general rate increase for Olympic Water and Sewer, Inc., which would generate approximately $251,000 in additional annual revenue (25.5 percent). The commission will also review petitions related to Lifeline service expansion, highway signs, and railroad crossings, and take no action on several tariff filings and other items.
- Olympic Water and Sewer rate increase: ~$251,000 (25.5%) for ~1,740 customers in Jefferson County
- Assurance Wireless petition to expand Lifeline-only ETC service area
- Thurston County petition for exempt signs at Mayes Road
- WSDOT petition to modify highway-rail grade crossing at SR-904, Cheney
- Inland Empire Railway Historical Society petition for new crossing at Old Sunset Highway, Reardan
The Washington Utilities and Transportation Commission approved the consent agenda unanimously (3-0). The commission took no action on Olympic Water and Sewer's general rate increase request, allowing the tariff pages to become effective June 23, 2025, by operation of law. The rate increase, as revised, would generate approximately $251,000 (25.5 percent) additional annual revenue for water services.
- Approved consent agenda (3-0)
- Took no action on Olympic Water and Sewer rate increase, allowing tariff to become effective June 23, 2025 (3-0)
- Tariff Revision
- Eligible Telecommunications Carrier
- Petition
- Petition
- Petition
Open Meeting
The Washington Utilities and Transportation Commission will consider several utility and solid waste rate increase requests, including a proposed general rate increase for Washington Water Service Company's Stroh's water system and multiple garbage collection rate hikes. The agenda also includes tariff revisions, a request for proposals from Avista, and several consent items with no action expected.
- Washington Water Service proposes 30.4% and 30.7% annual revenue increases for Stroh's water system over two years, affecting ~830 customers in Pierce County
- Murrey's Disposal seeks ~$5.8 million (10.3%) additional annual revenue for garbage, recycling, yard waste, and medical waste services for ~73,000 Pierce County customers
- Sanitary Service Company requests ~$1.9 million (6.4%) rate increase for ~49,000 Whatcom County residential customers
- Cascade Natural Gas tariff revision reduces revenue by $15.98 million (16%), decreasing average residential bills by $1.19 per month
- Avista Corporation to issue 2025 All Source Request for Proposals for resource needs
The Washington Utilities and Transportation Commission approved Avista Corporation's amended All Source Request for Proposals with conditions, and approved Murrey's Disposal Company's rate increase provisionally subject to review and refund. The Commission took no action on several other rate filings, allowing them to take effect by operation of law, including rate increases for Sanitary Service Company, Torre Refuse & Recycling, Rabanco Ltd., Cascade Natural Gas, and Washington Water Service. The consent agenda was approved unanimously.
- Approved Avista's amended All Source RFP with conditions (3-0)
- Approved Murrey's Disposal rate increase provisionally, subject to review and refund (3-0)
- Allowed Cascade Natural Gas Schedule 700 decrease to take effect by operation of law (3-0)
- Allowed Washington Water Service rate increase to take effect by operation of law (3-0)
- Allowed Sanitary Service Company rate increase to take effect by operation of law (3-0)
- Allowed Torre Refuse & Recycling rate increase to take effect by operation of law (3-0)
- Allowed Rabanco Ltd. rate increase to take effect by operation of law (3-0)
- Approved consent agenda (3-0)
- Tariff Revision
- Tariff Revision
- Tariff Revision
- Tariff Revision
- Request for Proposal
- Petition for Accounting Order
- Tariff Revision
- Application for Transfer
Open Meeting
The Washington Utilities and Transportation Commission will consider San Juan Express's petition to temporarily discontinue commercial ferry service between Seattle and Friday Harbor for 12 months, with a request to waive customer notice requirements. The meeting also includes tariff revisions from Puget Sound Energy and other utilities, a petition for exemption from railroad safety standards, and several no-action items.
- San Juan Express petition to discontinue ferry service between Seattle and Friday Harbor for 12 months (May 10, 2025–May 10, 2026)
- Puget Sound Energy tariff revisions (dockets UG-040640 and UE-040641) to be heard at recessed meeting on May 12, 2025
- BNSF Railway and Union Pacific petition for exemption from private crossing safety standards (WAC 480-62-270(2))
- PacifiCorp tariff revision providing one-time $400 arrearage grant to low-income bill assistance customers
- Tanager Telecommunications cessation of service and registration cancellation
The Washington Utilities and Transportation Commission approved San Juan Express, Inc.'s petition to temporarily discontinue commercial ferry service between Seattle and Friday Harbor for up to 12 months, subject to conditions including a public comment period and a final decision at the May 22, 2025 open meeting. The motion carried 3-0. No other substantive decisions were made; the consent agenda was approved and two Puget Sound Energy tariff items were noted for a recessed meeting but no action was recorded.
- Approved consent agenda (3-0)
- Granted San Juan Express petition to temporarily discontinue ferry service, with conditions (3-0)
- Scheduled final consideration of San Juan Express petition for May 22, 2025 open meeting
- Required San Juan Express to maintain public notice for at least 15 days prior to May 22, 2025
- Required San Juan Express to file operational update by December 31, 2025
- Required San Juan Express to file discontinuance request for 2026 season by March 30, 2026
- Petition
- Tariff Revision
- Tariff Revision
- Petition for Exemption
Open Meeting
The Washington Utilities and Transportation Commission is meeting to consider several utility and transportation rate requests, including a water rate increase for East Side Improvement Co. and solid waste rate increases for Kent-Meridian Disposal and Rabanco Ltd. The commission will also review Puget Sound Energy's conservation reports and proposed tariff changes that would raise residential electric and gas bills. Several items are listed as no-action or consent, indicating they may be routine or uncontested.
- East Side Improvement Co. water rate increase: $25,925 (54%) for 44 customers in Kittitas County
- Kent-Meridian Disposal solid waste rate increase: ~$1,074,310 (7.26%) for 22,000 King County customers
- Rabanco Ltd. (Eastside Disposal) rate increase: ~$321,000 (4.9%) for 11,000 King County customers
- Puget Sound Energy electric conservation rider increase: $38.6M, raising average residential bill by $1.41/month
- Puget Sound Energy low-income program funding increase: $34.8M electric, raising average bill by $4.22/month
The Washington Utilities and Transportation Commission unanimously approved the consent agenda and voted to reconsider two Puget Sound Energy accounting orders, disallowing carrying costs. The commission also extended consideration of a water rate case, suspended two solid waste rate increases subject to refund, and approved a ferry ownership transfer.
- Approved consent agenda (3-0)
- Reconsidered Puget Sound Energy accounting orders UE-220196 and UG-220197 to disallow carrying costs (3-0)
- Extended consideration of East Side Improvement Co. water rate case UW-250104 to June 26, 2025 (3-0)
- Suspended Kent-Meridian Disposal rate increase TG-250164, allowing rates to take effect subject to refund (3-0)
- Suspended Rabanco Ltd. d/b/a Eastside Disposal rate increase TG-250171, subject to refund (3-0)
- Approved transfer of Backcountry Travels LLC d/b/a Stehekin Ferry ownership to Brun Garfoot and Reed Courtney (3-0)
- Tariff Revision
- Petition for Exemption
- Petition for Accounting Order
- Application for Transfer
- Petition for Accounting Order
- Tariff Revision
- Tariff Revision
- Tariff Revision
Open Meeting
The Washington Utilities and Transportation Commission is meeting to consider utility and transportation matters, including a rate increase request from Murrey's Disposal Company for garbage and recycling services in Pierce County. The commission will also review petitions for accounting orders, a water company asset transfer, and several consent agenda items.
- Murrey's Disposal Company requests a 7.4% general rate increase generating approximately $4,236,000 in additional annual revenue for solid waste services in Pierce County
- Joint petition for a three-year participatory funding agreement for regulatory proceedings
- Puget Sound Energy petitions for deferred accounting for fund grants under the Washington Participatory Funding Agreement
- Canyon Lakes Water Company requests approval for sale and transfer of assets to Canyon Lakes Waterworks, LLC, serving about 200 customers in Kennewick
- PacifiCorp petitions to amend an accounting order to defer costs for demand response programs
- Policy Statement
- Petition for Accounting Order
- Petition for Accounting Order
- Transfer of Property
- Tariff Revision
- Petition for Accounting Order
- Petition for Exemption
Open Meeting
The Washington Utilities and Transportation Commission will hold an open meeting to consider several utility and transportation rate increase requests, including water, garbage, and electric services. The agenda includes items for discussion, consent, and no action, with most involving tariff revisions and rate adjustments.
- Puget Sound Energy petition for deferred accounting related to a physical tolling agreement with Gray's Harbor Energy LLC.
- East Side Improvement Co. water rate increase: agreed to $25,925 (54%) additional annual revenue for 44 customers in Kittitas County.
- Consolidated Disposal Services garbage rate increase: agreed to $911,930 (11.5%) additional annual revenue for 20,250 customers in Grant and Adams County.
- Torre Refuse & Recycling garbage rate increase: $70,000 (17.8%) additional annual revenue for 500 customers in Ferry and Okanogan Counties.
- Consent items include Lifeline carrier designations for TAG Mobility and Prepaid Wireless Group, and sale of Canyon Lakes Water Company assets.
The Washington Utilities and Transportation Commission approved the consent agenda (3-0), excluding two items, and continued three utility matters to future open meetings. The commission took no action on several tariff revisions, allowing them to take effect by operation of law on April 1, 2025.
- Approved consent agenda items except E2 and F7 (3-0)
- Continued Puget Sound Energy deferred accounting petition to May 22, 2025 (3-0)
- Continued East Side Improvement Co. rate increase to April 24, 2025 (3-0)
- Continued Canyon Lakes Water Company asset transfer to April 10, 2025 (3-0)
- Took no action on Puget Sound Energy tariff, allowing it to take effect April 1, 2025
- Took no action on Consolidated Disposal Services rate increase, allowing it to take effect April 1, 2025
- Took no action on Torre Refuse & Recycling rate increase, allowing it to take effect April 1, 2025
- Tariff Revision
- Tariff Revision
- Petition
- Tariff Revision
- Transfer of Property
- Petition
- Petition for Accounting Order
- Tariff Revision
Open Meeting
The Washington Utilities and Transportation Commission is reviewing tariff revisions for three waste disposal companies to recover increased landfill fees. Additionally, the Commission will hear PacifiCorp's 2025 Draft Electric Integrated Resource Plan. Several other items, including a shuttle fare increase and a water main contract, are listed for no action.
- Waste Management of Washington, Inc. requests tariff revisions generating approximately $105,000 (7.7%) additional annual revenue for Skagit County customers.
- Island Disposal, Inc. requests tariff revisions generating approximately $340,000 (6%) additional annual revenue for Island County customers.
- PacifiCorp d/b/a Pacific Power & Light Company presents its 2025 Draft Electric Integrated Resource Plan.
- Ed's Disposal, Inc. and Basin Disposal Inc. request tariff revisions to recover increased drop box disposal fees at Sudbury and Finley Buttes Landfills.
- BML Investments LLC requests a 5 percent increase for flexible fares on the Wenatchee Valley Shuttle.
The Washington Utilities and Transportation Commission held a regular meeting on March 13, 2025. The only substantive action was unanimous approval of the consent agenda (3-0), which directs the Secretary to sign necessary orders and letters. No utilities, transportation, or other items were on the agenda for decision. The afternoon session was for presentation only: PacifiCorp's 2025 Draft Electric Integrated Resource Plan, with no action taken.
- Approved consent agenda (3-0)
- Heard PacifiCorp 2025 Draft Electric Integrated Resource Plan (presentation only)
- Tariff Revision
- Tariff Revision
- Petition for Exemption
- Plan
- Tariff Revision
- Tariff Revision
Open Meeting
The Washington Utilities and Transportation Commission will hold an open meeting to consider several utility and transportation matters. Key items include a proposed late fee increase by Ziply Fiber, a water rate increase for Wildwood Water Company, and multiple tariff revisions for waste disposal companies. The agenda also includes consent items and filings that require no action.
- Ziply Fiber proposes raising minimum late payment fee from $12 to $15, estimated to generate $197,259 annually (0.36%)
- Wildwood Water Company rate increase request, settled at approximately $34,050 (34.1%) additional annual revenue for 229 customers in Island County
- Basin Disposal of Washington tariff revision to reflect Columbia County Transfer Station disposal fee increase from $106.17 to $109.36 per ton
- Murrey's Disposal tariff revisions to recover increased disposal fees at LRI (from $174.84 to $184.99 per ton) and commodity price adjustments
- Harold LeMay Enterprises tariff revisions to recover increased disposal fees at LRI and for Joint Base Lewis-McChord, plus commodity adjustments
The Washington Utilities and Transportation Commission approved the consent agenda and took action on three utility items. It ordered PacifiCorp to refund $64,000 to ratepayers for a 2023 capital review, suspended Ziply Fiber's late fee increase and opened an investigation, and took no action on Wildwood Water's rate increase, allowing it to take effect by operation of law.
- Approved consent agenda (2-0)
- Ordered PacifiCorp to refund $64,000 to ratepayers for Foote Creek II-IV project (2-0)
- Suspended Ziply Fiber's late payment fee increase and instituted investigation (2-0)
- Took no action on Wildwood Water rate increase, allowing it to become effective March 1, 2025
- Tariff Revision
- Staff Investigation
- Tariff Revision
- Petition for Exemption
- Petition for Exemption
- Certificate
- Tariff Revision
- Petition
Open Meeting
The Washington Utilities and Transportation Commission is reviewing a petition from Olympic Water and Sewer, Inc. to implement a surcharge covering 70% of the cost to scrub pipes and remove manganese and iron deposits. The commission is also considering a request by Puget Sound Energy to defer accounting for $10.7 million in increased insurance premiums due to wildfires. Additionally, the agenda includes petitions from the City of Wenatchee to modify or close highway-rail grade crossings at Hawley, McKittrick, and Miller Streets.
- Olympic Water and Sewer, Inc. proposes a surcharge of $5.66 in year one and $6.20 in year two, or a one-time payment of $135.81, effective February 18, 2025, to February 17, 2027.
- Puget Sound Energy petitions for deferred accounting of an estimated $10.7 million increase in insurance premiums for coverage from December 2023 to January 2025.
- City of Wenatchee petitions to close a highway-rail grade crossing at Hawley Street and construct grade separations at McKittrick Street and Miller Street.
- Avista Corporation's 2025 Annual Conservation Plan projects 45.9 thousand megawatt-hours of savings with a budget of $26.6 million.
- The Rock Transportation Services Corporation requests a 5 percent increase for flexible fares in Tariff No. 7.
- Petition for Accounting Order
- Petition
- Tariff Revision
- Petition
- Tariff Revision
- Petition
- Petition
- Cessation of Service
Open Meeting
The Washington Utilities and Transportation Commission is reviewing two major solid waste rate increases and several utility tariff revisions. The most significant financial impacts involve Sunrise Disposal, which requests a 49.8% increase, and Zippy Disposal, which agreed to a 5.33% increase. The agenda also includes consent items for Pacific Power & Light, Sanitary Service Company, and Waste Management of Washington, as well as no-action items for annual conservation plans from major electric and gas utilities.
- Sunrise Disposal, Inc. requests a general rate increase generating approximately $70,814 (49.8%) additional annual revenue for garbage collection in Douglas, Grant, Lincoln, and Okanogan Counties.
- Zippy Disposal Service, Inc. requests a general rate increase of approximately $113,000 (5.33%) for garbage and recycling services in Chelan, Okanogan, and Douglas Counties.
- Sanitary Service Company, Inc. proposes a yardwaste disposal fee increase from $67.00 to $69.00 per ton at Green Earth Technology, effective February 1, 2025, for Whatcom County customers.
- Waste Management of Washington, Inc. requests a $1.55 monthly credit increase (from $0.30 to $1.85) for residential recycling customers in Chelan, Douglas, Lincoln, and Okanogan Counties.
- Pacific Power & Light Company requests approval of a stranded cost recovery fee for a departing customer as directed by Order 09.
The Washington Utilities and Transportation Commission approved the consent agenda and designated DISH Wireless L.L.C. as an Eligible Telecommunications Carrier for Lifeline service, with exemptions from certain filing requirements. The commission took no action on two solid waste rate increases, allowing them to take effect by operation of law. Two items were postponed to a future meeting.
- Approved consent agenda (2-0)
- Approved DISH Wireless designation as ETC for Lifeline service (2-0)
- Granted exemptions from WAC 480-123-030(1)(d), (f), (g) to DISH Wireless
- Allowed Zippy Disposal rate increase to take effect (no action)
- Allowed Sunrise Disposal rate increase to take effect (no action)
- Moved Avista conservation plan dockets to future meeting
- Tariff Revision
- Tariff Revision
- Tariff Revision
- Petition
- Tariff Revision
- Petition
- Petition for Exemption
- Tariff Revision
Open Meeting
The Washington Utilities and Transportation Commission will hold an open meeting to consider several utility and transportation items. These include a petition from Northwest Natural Gas for deferred accounting of its Arrearage Management Program, a proposed increase in Puget Sound pilotage rates, and tariff corrections from Waste Management. The agenda also includes funding requests for grade crossing safety projects in Marysville and Spokane.
- Northwest Natural Gas petition for deferred accounting of Arrearage Management Program costs (UG-240920)
- Puget Sound Pilotage District rate increase from $19 to $23 per item 380 (TP-240966)
- Waste Management tariff correction for drop box disposal fees in King County, increasing to $165.91 per ton plus $37.92 annual charge (TG-250009)
- City of Marysville application for Grade Crossing Protective Fund for aerial drone purchase (TR-240666)
- BNSF Railway application for Grade Crossing Protective Fund for fencing projects in Spokane (TR-240943)
The Washington Utilities and Transportation Commission approved a consent agenda and a tariff revision for the Puget Sound Pilotage District, increasing a rate from $19 to $23. The tariff change, proposed by the Board of Pilotage Commissioners, takes effect January 17, 2025. Both motions passed unanimously (2-0).
- Approved consent agenda (2-0)
- Approved Puget Sound Pilotage tariff increase from $19 to $23, effective January 17, 2025 (2-0)
- Tariff Revision
- Application for Funding
- Petition for Accounting Order
- Application for Funding
- Staff Investigation
- Tariff Revision