The Terrebonne Levee and Conservation District will meet on December 17, 2025, to approve key contracts and resolutions, including a $4.57 million levee rehabilitation project and a $70,800.70 floodgate paint purchase. The board will also discuss pending litigation and receive updates on ongoing projects.
- Approval of Sherwin Williams quote for Bush Canal Floodgate paint under State Contract: $70,800.70
- Recommendation of award to Rigid Constructors, LLC for Reach I Levee Rehabilitation — Segment 2: $4,573,000.00
- Resolution 25-035 to grant Substantial Completion to Onshore Materials for Reach J-3 Rehabilitation
- Resolution 25-036 to grant Substantial Completion to Lowland Construction Company for TLCD Annual Levee Maintenance
- Approval of Amendment No. 1 to Norris and Boudreaux Contractor’s Emergency Preparedness Operations Contract from Hurricane Delta
The Board approved several project contracts and resolutions, including a $4.57M award for Reach I Levee Rehabilitation. Members also approved financial reports, operating invoices, and substantial completion grants for two rehabilitation projects.
- Approved $4,573,000.00 award to Rigid Constructors for Reach I Levee Rehabilitation — Segment 2
- Approved $70,800.70 Sherwin Williams quote for Bush Canal Floodgate paint
- Approved Engineering and Design Contract with GFP for TLCD Office and Maintenance Building
- Approved Resolution 25-035 granting Substantial Completion to Onshore Materials for Reach J-3 Rehabilitation Project
- Approved Resolution No. 25-036 granting Substantial Completion to Low Land Construction for Reach J2/J3 Levee Segments
- Approved Amendment No. 1 to Norris and Boudreaux Contractor’s Emergency Preparedness Operations Contract
- Approved Final Balancing Change Order No. 8 for Low Land Construction in the amount of ($173,487.50)
- Approved Operating and Engineering Invoices and Financial Report FME 30 November 2025
Terrebonne Levee and Conservation District
The Terrebonne Levee and Conservation District will review project reports and finance matters. The body is considering several high-value invoices and amendments related to the Houma Navigation Canal Lock Complex.
- Sealevel Invoice #23105-17 for HNC Lock Complex Phase 2 in the amount of $10,493,862.03
- APTIM Invoice #692129 for HNC Lock Complex Phase 2 in the amount of $361,893.75
- Authorization to advertise labor quotes for the Pointe Aux Chenes Receiving Structure & Floodwall Resurfacing Project
- Final Balancing Change Order No. 2 for Sealevel Construction for the Reach L Rehabilitation Project in the amount of ($2,975.00)
- Amendment No. 2 to the Intergovernmental Agreement between CPRA and TLCD for Houma Navigation Canal Lock Complex Phase II Construction
The Board approved multiple invoices, including a $10.49M payment to Sealevel and a $361,893 payment to APTIM. Members also authorized labor quotes for the Pointe Aux Chenes project and an agreement amendment for the Houma Navigation Canal Lock Complex.
- Approved APTIM invoice #692129 for $361,893.75
- Approved Sealevel invoice #23 105-017 for $10,493,862.03
- Approved Operating and Engineering invoices
- Approved Authorization to Advertise Labor Quotes for Pointe Aux Chenes Receiving Structure & Floodwall Resurfacing Project
- Approved Final Balancing Change Order No. 2 for Sealevel Construction ($2,975.00) for Reach L Rehabilitation Project
- Approved Amendment No. 2 to the Intergovernmental Agreement between CPRA and TLCD for Phase II Construction of the Houma Navigation Canal Lock Complex
- Approved meeting minutes dated November 19, 2025
Terrebonne Levee and Conservation District
The Terrebonne Levee and Conservation District will review several change orders for levee rehabilitation projects and approve quotes for barge gate sensor replacements. The body will also discuss the 2025 Emergency Contingency Plan and potential litigation in executive session.
- Quote from Beier for Bush Canal Barge Gate tank level sensors: $19,655.00
- Final Balancing Change Order No. 2 for Lirette Dirt Services (Reach B Levee): ($87,642.50)
- Final Balancing Change Order No. 1 for Onshore Materials (Lower Dularge East Levee): $3,435.77
- Change Order No. 7 for Low Land Construction (Reach J2/J3/K): ($191,331.00)
- Change Order No. 11 for Onshore Materials (Reach J2/J3/K): $128,032.00
The Board approved several levee rehabilitation contracts and change orders, including a major award to Lirette Dirt Services. Members also authorized the 2025 Emergency Contingency Plan and the 2026 meeting schedule.
- Awarded $971,231.50 to Lirette Dirt Services for Upper Reach I Rehabilitation (Passed)
- Awarded $631,010.00 to Allied Shipyard for Bush Canal Barge Gate Dry Dock contract (Passed)
- Awarded $80,400.00 to Sealevel Construction for Bush Canal Barge Gate Transportation (Passed)
- Approved $16,655.00 quote from Beier for Bush Canal Barge Gate tank level sensors (Passed)
- Approved Resolution 25-032 for the 2025 Emergency Contingency Plan (Passed)
- Approved Resolution 25-034 for USACE Right of Entry for Upper Reach F (Passed)
- Approved Change Order No. 11 for Onshore Materials for $128,032.00 (Passed)
- Approved Change Order No. 7 for Low Land Construction for ($191,331.00) (Passed)
Terrebonne Levee and Conservation District
The Terrebonne Levee and Conservation District will review project updates and finance matters. The body is deciding on several intergovernmental agreements and professional service proposals for levee and water control projects.
- Sealevel Invoice #23105-16 for HNC-P2-C016 in the amount of $38,737,585.43
- APTIM Invoice #686933 for HNC-P2-S016 in the amount of $333,557.50
- Intergovernmental Agreements with CPRA for Reach L Apache Farms Levee Lift (No. TE-0184) and Upper Reach I Levee Lift (No. TE-0185)
- Resolution 25-031 to grant Substantial Completion to Sealevel Construction for the Reach L Rehabilitation Project
- Final Balancing Change Order No. 6 for Lirette Dirt Services in the amount of ($64,252.55)
The Board approved several high-value invoices for Sealevel and APTIM and authorized two intergovernmental agreements with the CPRA for the Upper Reach I Levee Lift project. Additionally, the Board approved professional services for office improvements and water control structures.
- Approved Sealevel invoice #23105-016 for $8,737,585.43
- Approved APTIM invoice #686933 for $333,557.50
- Approved Sealevel invoice #23105-016A for Francine Dredging for $240,438.00
- Approved CPRA agreement for Upper Reach I Levee Lift ($1.5 million to raise level to 12 feet)
- Approved CPRA agreement for Upper Reach I Levee Lift ($12.2 million to bring Reach I to 15 feet)
- Approved Resolution 25-031 granting Substantial Completion to Sealevel Construction for Reach L Rehabilitation
- Approved Proposal for Professional Services for Delta Coast Consultants for Office Site Improvements (Phase 2)
- Approved Proposal for Professional Services for AllSouth Consulting Engineers, LLC for Reach K Water Control Structures
Terrebonne Levee and Conservation District
The Terrebonne Levee & Conservation District will consider resolutions and contracts for several flood-protection projects, including the Eastern Terrebonne Restoration Project and Morganza-to-the-Gulf levee work. The board may also enter executive session to discuss pending litigation. Public comments are invited.
- Resolution 25-028: IGA with CPRA for engineering/design of Eastern Terrebonne Restoration Project
- Program management contract with Delta Coast Consultants for Eastern Terrebonne Restoration
- Engineering & design contract with GIS Engineering for Eastern Terrebonne Restoration
- Resolution 25-029: Appropriation of permanent levee servitude for Reach I of Morganza to the Gulf
- Change Order No. 1 for Sealevel Construction on Reach L Rehabilitation: $60,000
The Board approved Resolution 25-028 to execute an IGA with CPRA for the 94-mile Eastern Terrebonne Restoration Project. Related program management and engineering contracts were approved, subject to CPRA approval. The Board also authorized a levee servitude for Reach I and awarded a rehabilitation project to Lirette Dirt Services.
- Approved Resolution 25-028 for Eastern Terrebonne Restoration Project IGA
- Approved Program Management Contract with Delta Coast Consultants
- Approved engineering and design contract with GIS Engineering
- Approved Resolution 25-029 for permanent levee servitude for Reach I
- Approved Resolution 25-030 granting Substantial Completion to Onshore Materials
- Recommended award to Lirette Dirt Services for Upper Reach I Rehabilitation ($971,231.50)
- Recommended final acceptance to Justin J. Reeves LLC for Reach A Emergency Levee Segment 1
- Approved $60,000 Change Order No. 1 for Sealevel Construction (Reach L Rehabilitation)
Terrebonne Levee and Conservation District
The board will consider approval of a $9,880,942.47 invoice for the HNC Lock Complex Phase 2, along with several change orders and amendments for levee repair and construction projects. An executive session is planned to discuss pending litigation. Public comments will be heard.
- Approval of $34,130.00 quote from W&O Supply for valve replacement on Bush Canal Floodgate
- APTIM invoice #683029 for $295,020.25 for HNC Lock Complex Phase 2
- Sealevel invoice #23105-15 for $9,880,942.47 for HNC Lock Complex Phase 2
- Change Order No. 4 for Lirette Dirt Services: ($0.75) to balance FEMA items
- Change Order No. 5 for Lirette Dirt Services: $268,230.00 for embankment transport
The Board approved several high-value invoices, including a $9.8M payment to Sealevel and $295,020.25 to APTIM. Members also authorized multiple change orders and amendments for levee lift and maintenance projects. The board received progress updates on the HNC lock and various Reach projects.
- Approved Sealevel invoice #23105-015 for $9,880,942.47
- Approved APTIM invoice #683029 for $295,020.25
- Approved W&O Supply quote for $34,130.00 for Bush Canal Floodgate replacement valves
- Approved Operating and Engineering invoices
- Approved Change Order No. 5 for Lirette Dirt Services for $268,230.00
- Approved Change Order No. 4 for Lirette Dirt Services for -$0.75
- Approved Amendment No. 9 with Angelette Designs for $16,800.00
- Approved Amendment No. 4 with GIS for $301,645.00
Terrebonne Levee and Conservation District
The Terrebonne Levee and Conservation District will consider approving two equipment purchases totaling $804,955.46: two Kubota tractors from Ascension Equipment Sales and two bush hogs from Parish Tractor Company. The board will also discuss a $7,289,315 change order for the Reach H3/H2 levee lift project, a $3,634,000 amendment for the HNC Lock Complex Phase 2, and a potential executive session on pending litigation. A resolution authorizing a cooperative endeavor agreement with the state for a district office building and possible consent agreements with the EPA for Reach A emergency levee projects are on the agenda.
- Approval of $748,713.56 quote for two Kubota 4WD midsize utility tractors (Contract No. 4400025216)
- Approval of $56,241.90 quote for two BW15.72 cutter bush hogs from Parish Tractor Company (Contract No. 178608)
- Discussion and possible action on Change Order No. 2 for Reach H3/H2 levee lift project ($7,289,315.00 and 150 additional days)
- Approval of Amendment No. 15 ($3,634,000) to APTIM contract for HNC Lock Complex Phase 2 construction administration
- Discussion and possible action on Resolution 25-027 for a CEA with the State of Louisiana for District Office Building/Satellite EOC and LDWF Facility
The Board approved several equipment purchases and project amendments, including a significant funding increase for the Reach H2/H3 Levee Lift. Other actions included authorizing a CEA with the State of Louisiana and approving professional services for the HNC Lock Complex.
- Approved $7,289,315.00 and 150 calendar days for Change Order No. 2 (Rigid Constructors, Reach H2/H3 Levee Lift)
- Approved $3,634,000 Amendment No. 15 for APTIM (HNC Lock Complex professional services)
- Approved $148,713.56 for two Kubota 4WD midsize Utility Tractors
- Approved $56,241.90 for two BW 15.72 Cutter Bush Hogs
- Approved Resolution 25-027 to enter into a CEA with the State of Louisiana for District Office Building/Satellite EOC and LDWF Facility
- Approved $13,500.00 Change Order No. 10 for settlement plates at Williams Pipeline Crossing
- Approved authorization to advertise labor quotes for Upper Reach I Levee Rehabilitation Project
- Approved consent agreements with the EPA for Reach A Emergency Levee Projects
Terrebonne Levee and Conservation District
The board will consider approving two large invoices for the HNC Lock Complex Phase 2 project, totaling over $7.2 million, and several final balancing change orders for Hurricane Francine emergency scour repairs. They may also enter executive session to discuss pending litigation and vote on an encroachment agreement for the Morganza to the Gulf project.
- APTIM Invoice #680475 for $301,282.25 and Sealevel Invoice #23105-14 for $6,907,511.57 for HNC Lock Complex Phase 2
- Final Balancing Change Order No. 1 to Sealevel Construction for ($48,886.30) for Reach J-2 Hurricane Francine emergency scour repair
- Final Balancing Change Order No. 2 to Low Land Construction for ($42,609.48) for Reach J-3 Hurricane Francine emergency scour repair
- Authorization to execute an encroachment agreement with Harvest Midstream for the Morganza to the Gulf Reach L Levee and Floodwall Project
- Potential executive session to discuss litigation in three cases, including Pontchartrain Partners, LLC vs. Terrebonne Levee & Conservation District
The Board approved several high-value invoices and a bid for the Reach L Rehabilitation project. Members also authorized multiple balancing change orders for Hurricane Francine emergency scour repairs and an encroachment agreement with Harvest Midstream.
- Approved Sealevel invoice #23105-014 for $6,907,511.57
- Approved APTIM invoice #680475 for $301,282.25
- Approved Operating and Engineering invoices
- Approved encroachment agreement with Harvest Midstream for Reach L Levee and Floodwall Project
- Approved bid to Sealevel Construction for Reach L Rehabilitation project for $228,525.00
- Approved Change Order No. 1 for Lirette Dirt Services for Reach B Levee Emergency Rehabilitation for $61,250.00
- Approved Final Balancing Change Orders No. 1, 2, 3, 4, and 5 for various scour repair and maintenance projects
- Approved meeting minutes dated August 20, 2025
Terrebonne Levee and Conservation District
The Terrebonne Levee and Conservation District will review capital project updates and financial reports. The body is deciding on several project completions, a security agreement with the Sheriff's Office, and contract change orders.
- Change Order No. 8 for Sealevel Construction for $425,197.67 regarding the HNC Lock Complex
- Intergovernmental Agreement with Terrebonne Parish Sheriff's Office for security patrol and storm assistance
- Resolution 25-025 for Substantial Completion to Low Land Construction Company for Reach J-3 Hurricane Francine Scour Repair
- Resolution 25-026 for Substantial Completion to Sealevel Construction for Reach J-2 Hurricane Francine Scour Repair
- Contract Proposal with GIS Engineering for Bush Floodgate Maintenance Dry Dock
The Board approved an intergovernmental agreement with the Terrebonne Parish Sheriffs Office for security and storm assistance. Members also authorized several construction change orders and granted substantial completion for hurricane scour repairs. A new engineering contract for the Bush Floodgate Dry Dock was approved.
- Approved Intergovernmental Agreement with Terrebonne Parish Sheriffs Office for security patrol and storm assistance
- Approved final acceptance for Onshore Materials for Lower Dularge East Levee Rehabilitation Project Phase 3-B
- Approved Resolution 25-025 granting substantial completion to Low Land Construction Company for Reach J-3 Hurricane Francine Scour Repair
- Approved Resolution 25-026 granting substantial completion to Sealevel Construction for Reach J-2 Hurricane Francine Scour Repair Structure No. 1 to Point Farm Road
- Approved no-cost Change Order No. 2 for Sealevel Construction for Reach L Floodwall Project personnel pipeline training
- Approved Change Order No. 8 for Sealevel Construction for $425,197.67 for HNC Lock Complex dredging and 14 additional calendar days
- Approved contract proposal with GIS Engineering for Professional Engineering Services for Bush Floodgate Dry Dock Maintenance
- Approved Operating and Engineering Invoices and Financial Report FME 31 July 2025
Terrebonne Levee and Conservation District
The Terrebonne Levee & Conservation District board will consider approving a $8,908,487.87 invoice from Sealevel for Phase 2 of the HNC Lock Complex, along with other invoices and contract awards totaling over $4.3 million for levee maintenance and emergency repairs. The board may also enter executive session to discuss pending litigation.
- Sealevel invoice #23105-13 for $8,908,487.87 for HNC Lock Complex Phase 2
- APTIM invoice #677434 for $307,343.75 for HNC Lock Complex Phase 2
- Recommend award to Lirette Dirt Services for $3,141,000.00 for annual levee maintenance
- Recommend award to Lirette Dirt Services for $354,750.00 for Reach B Levee emergency rehabilitation
- Recommend award to Norris and Boudreaux Contractors for $728,740.00 for yearly maintenance and service contract
The Board approved several high-value invoices and awarded multiple maintenance and emergency rehabilitation contracts for levee reaches. It also authorized new fiscal agents and approved project amendments and change orders.
- Approved Sealevel invoice #23105-013 for $8,908,487.87
- Approved APTIM invoice #677434 for $307,343.87
- Awarded $3,141,000.00 to Lirette Dirt Services for Upper Reach I Levee embankment supply
- Awarded $728,740.00 to Norris and Boudreaux Contractors for Yearly Maintenance and Service Contract
- Awarded $354,750.00 to Lirette Dirt Services for Reach B Levee Emergency Rehabilitation
- Awarded $103,990.00 to Onshore Materials for Lower Dularge East Levee Emergency Rehabilitation
- Approved Resolution 25-023 naming B1 Bank and South Louisiana Bank as Fiscal Agents
- Approved Resolution 25-024 granting Sealevel Construction Substantial Completion for Placid and Bush Canal
Terrebonne Levee and Conservation District
The Terrebonne Levee & Conservation District will consider approving several engineering contract amendments and change orders, including a $21,445 change order for the HNC Lock Complex Phase 2 and a final balancing change order of ($129,465.46) for Reach L Segment 1. The board may also enter executive session to discuss pending litigation.
- Final Balancing Change Order No. 15 for Onshore Materials on Reach L Segment 1: ($129,465.46)
- Final Balancing Change Order No. 1 for Sealevel Construction on Bayou Petit Caillou floating barge gate: ($59,500)
- Change Order No. 7 for Sealevel Construction on HNC Lock Complex Phase 2: $21,445
- Amendment No. 8 with Angelette Design for Grand Bayou to Apache Farm Levee: $71,570
- Possible executive session to discuss three pending lawsuits
The Board approved Resolution 25-022 to declare an emergency based on updated centerline surveys for Reach B and Lower Dularge East. Members also approved several project amendments, change orders, and financial reports.
- Approved Resolution 25-022 declaring emergency for Reach B and Lower Dularge East
- Approved $115,429.00 Amendment No. 6 for Reach K Phase 2 Engineering Services
- Approved $71,570.00 Amendment No. 8 for Grand Bayou to Apache Farm Levee
- Approved $21,445.00 Change Order No. 7 for HNC Lock Complex Phase 2
- Approved ($129,465.46) Final Balancing Change Order No. 15 for Reach L Segment 1
- Approved ($59,500) Final Balancing Change Order No. 1 for Bayou Petit Caillou Floating Barge Gate
- Approved project closeout amendments for Lower Reach I, Lower Dularge West, and Lower Dularge East Phase 3
- Approved Operating and Engineering Invoices and June 2025 Financial Report
Terrebonne Levee and Conservation District
The Terrebonne Levee Board will consider approving a $362,258.75 APTIM invoice and a $9,173,744.81 Sealevel invoice for the HNC Lock Complex Phase 2 project, plus a $129,582.00 change order for Reach J-3 and a $324,038.75 change order for Reach K, both related to Hurricane Francine-FEMA work. The board will also vote on the amended FY 2025 budget and the proposed FY 2026 budget, and may enter a closed executive session to discuss three pending lawsuits.
- Approval of APTIM Invoice #674658 for $362,258.75 and Sealevel Invoice #23 105-12 for $9,173,744.81 for HNC Lock Complex Phase 2.
- Presentation and vote on Amended Budget for FY ending June 30, 2025, and Proposed Budget for FY ending June 30, 2026.
- Potential executive session to discuss three pending lawsuits: Powell v. State, Aucoin v. State, and Pontchartrain Partners v. Terrebonne Levee & Conservation District.
- Authorization to advertise a labor quote package for the Reach L Apache Farm Levee Rehabilitation.
- Approval of Final Balancing Change Order No. 3 for Justin J Reeves in the amount of ($15,739.58) for Reach A Emergency Levee Segment 1.
The Board approved a change order for Rigid Constructors LLC to alter the embankment delivery method for the Reach H3 Levee Project. The Board also approved advertising bids for embankment supply to Reach I Levee.
- Approved Change Order No. 1 for Rigid Constructors LLC in the amount of $939,584.00 for Reach H3 Levee Project
- Approved advertising bids for Indefinite Embankment Supply to Reach I Levee
Terrebonne Levee and Conservation District
The Terrebonne Levee and Conservation District Board will consider a $939,584 change order for Rigid Constructors, LLC on the Reach H3 Levee Project, switching embankment delivery from hauled-in to barged-in because the Boudreaux Canal Swing Bridge is closed. The board will also authorize advertising bids for indefinite embankment supply to Reach I Levee.
- Change Order No.1 for Rigid Constructors, LLC in the amount of $939,584.00 for the Reach H3 Levee Project, changing embankment delivery from hauled-in to barged-in due to the Boudreaux Canal Swing Bridge closure
- Authorization to advertise bids for indefinite embankment supply to the Reach I Levee
The Board approved a change order for Rigid Constructors LLC to alter the embankment delivery method for the Reach H3 Levee Project. The Board also approved advertising bids for embankment supply for the Reach I Levee.
- Approved Change Order No. 1 for Rigid Constructors LLC in the amount of $939,584.00 for the Reach H3 Levee Project
- Approved advertising bids for the Indefinite Embankment Supply to Reach I Levee
Terrebonne Levee and Conservation District
The Terrebonne Levee and Conservation District will hold a public hearing regarding the proposed budget for the fiscal year ending June 30, 2026. The body will also consider budget amendments for the current fiscal year and review several levee and floodgate project updates.
- Public hearing on Proposed Budget FYE 30 June 2026 (Resolution No. 25-014)
- Resolution No. 25-013 in Support of Amended Budget FYE 30 June 2025
- Change Order No. 4 for Sealevel Construction for $52,904.00 regarding Placid and Bush Canal Floodgate Improvements
- Resolution 25-018 for Substantial Completion of Lower Dularge Levee West Emergency Rehabilitation Project
- Resolution 25-017 for Final Acceptance of TLCD Office Site Improvements Phase 1
The Board approved several high-value invoices, including a $12.6M payment to Sealevel and a $334,529.21 payment to APTIM. Members also authorized various change orders for levee rehabilitation and repair projects and extended a hurricane response contract. The 2025 Amended and 2026 Proposed Budgets were tabled for adoption at the June 18, 2025, meeting.
- Approved Sealevel invoice for $12,636,023.37
- Approved APTIM invoice #671945 for $334,529.21
- Approved insurance proposals from Aruther Gallagher
- Approved lease renewal with Damon Baldone for boat launch use
- Approved Emergency Services Contract schedule rates for 2025 Hurricane Season
- Extended Delta Coast Consultants Hurricane Ida Response Contracts to Dec 31, 2025
- Approved Change Order No. 1 for Low Land Construction for $299,250.00
- Approved Change Order No. 3 for Sealevel Construction for $270,020.00
Terrebonne Levee and Conservation District
The Terrebonne Levee & Conservation District will consider approving two large invoices for the HNC Lock Complex Phase 2 project: one from APTIM for $334,529.21 and one from Sealevel Construction for $12,636,023.37. The board will also vote on an amended budget for the current fiscal year and a proposed budget for FYE June 30, 2026, as well as insurance renewal proposals from Arthur Gallagher and USI. Additionally, the board may enter executive session to discuss pending litigation and will consider several change orders and resolutions for levee and floodgate projects.
- Award of insurance renewal proposals from Arthur Gallagher and USI
- Consideration of Amended Budget FYE June 30, 2025 and Proposed Budget FYE June 30, 2026
- HNC Lock Complex Phase 2 invoices: APTIM $334,529.21 and Sealevel $12,636,023.37
- Change Order No. 3 for Sealevel Construction on Placid and Bush Canal Floodgate Improvements: $270,020.00
- Resolution 25-015 to grant Allied Shipyard substantial completion for Bayou Petit Caillou Floating Barge Gate Maintenance
The board approved the April 30, 2025, financial report and operating and engineering invoices. An encroachment agreement with Discovery Gas Transmission, LLC for the Morganza to the Gulf Reach L Levee and Floodwall was authorized. Management and consultants provided updates on various levee and floodgate projects.
- Approved meeting minutes from May 7, 2025
- Approved Operating and Engineering invoices
- Approved Financial Report for April 30, 2025
- Approved Encroachment Agreement with Discovery Gas Transmission, LLC for Morganza to the Gulf Reach L Levee and Floodwall
Terrebonne Levee and Conservation District
The Terrebonne Levee and Conservation District will review project updates and financial reports. The body will consider authorizing an encroachment agreement for the Morganza to the Gulf Reach L Levee and Floodwall Project.
- Authorization of encroachment agreement with Discovery Gas Transmission, LLC
- Potential executive session regarding litigation including Pontchartrain Partners, LLC vs Terrebonne Levee & Conservation District
- Engineer reports on Reach K Rehabilitation and Lower Dularge Levee improvements
- Review of operating and engineering invoices
- Financial report for period ending April 30, 2025
The Board approved several high-value invoices and intergovernmental agreements for levee lift projects. Multiple change orders for construction costs and time extensions were approved for various reach segments and lock complexes. The board also awarded a concrete mattress materials bid to Premier Concrete Products, Inc.
- Approved Sealevel invoice for $9,066,903.26
- Approved Aptim invoice #669766 for $359,883.47
- Approved $518,100.00 award to Premier Concrete Products, Inc for concrete mattress materials
- Approved IGA with State of Louisiana for Reach H3/H2 Levee Lift (TE-0182)
- Approved Change Order No. 6 for Sealevel Construction (HNC Lock Complex Phase 2) for $240,438.00
- Approved Change Order No. 14 to Onshore Materials (Reach L Segment 1) for $337,001.00 and 216 additional days
- Approved Change Order No. 7 for Onshore Materials (Lower Dularge Levee West) for $94,221.00 and 30 additional days
- Approved Resolution 25-012 granting Substantial Completion to Onshore Materials for Reach L Segment 1
Terrebonne Levee and Conservation District
The Terrebonne Levee and Conservation District will consider approving over $9 million in invoices for the HNC Lock Complex Phase 2, including a $9.07 million Sealevel invoice and a $337,841.47 AECOM invoice. The board will also vote on an intergovernmental agreement with the state for the Reach H3/H2 Levee Lift project, a $518,100 contract for concrete mattress materials, and several change orders for ongoing levee and floodgate projects.
- HNC Lock Complex Phase 2 invoices: APTIM $359,883.47 and Sealevel $9,066,903.26
- Intergovernmental agreement with CPRA for Reach H3/H2 Levee Lift (TE-0182)
- Resolution 25-011 certifying compliance for H2/H3 Levee Improvements Lift Project
- Amendment No. 2 to IGA for Reach L Levee Lift (TE-0158)
- Recommendation of award to Premier Concrete Products, Inc. for $518,100.00 for articulated concrete mattress materials
The Board approved several major construction awards for floodwall and levee improvements funded by the CPRA. It also authorized funding amendments for engineering services and granted substantial completion for two projects. Other actions included approving financial statements and maintenance change orders.
- Awarded Reach L Floodwall Structure Pipeline Crossing to Sealevel Construction for $7,470,637.50
- Awarded Reach H2/H3 Levee Improvements Lift to EL. 15’+ to Rigid Constructors for $3,799,999.00
- Approved $2.5M Amendment No. 14 with APTIM for HNC Lock Complex Phase 2 Engineering
- Approved $301,645 Amendment No. 3 with GIS Engineering for H3 Levee Improvements
- Approved $35,973 Change Order No. 3 for Allied Shipyard for Bayou Petit Caillou Floating Barge Gate
- Approved Resolution 25-009 granting Substantial Completion to Onshore Materials for Lower Dularge East Levee Rehabilitation Project Phase 3-B
- Approved Resolution 25-010 granting Substantial Completion to Sealevel Construction for TLCD Office/EOC Site Improvements Phase 1
- Authorized advertisement of proposals for 2025 Emergency Services
Terrebonne Levee and Conservation District
The Terrebonne Levee & Conservation District will consider awarding two major construction contracts: $7,470,637.50 to Sealevel Construction for a floodwall structure and $3,799,999.00 to Rigid Constructors for levee improvements. The board will also vote on a $2.5 million amendment for the Houma Navigational Canal Lock Complex project and a resolution granting substantial completion for the Lower Dularge East Levee Rehabilitation. An executive session is planned to discuss pending litigation.
- Recommendation of award to Sealevel Construction, Inc. for $7,470,637.50 for Floodwall Structure for Reach L Pipeline Crossing
- Recommendation of award to Rigid Constructors, LLC for $3,799,999.00 for Reach H2/H3 Levee Improvements Lift to EL. 15+
- Approval of Amendment No. 14 for HNC Lock Complex Phase 2, adding $2,500,000.00
- Resolution 25-009 to grant Substantial Completion to Onshore Materials for Lower Dularge East Levee Rehabilitation Phase 3-B
- Executive session to discuss three pending lawsuits, including Pontchartrain Partners, LLC vs Terrebonne Levee & Conservation District
The Board approved several high-value invoices and contracts, including a $7.8M payment to Sealevel and a $1.9M agreement for aggregate materials. Members also granted substantial completion for two levee projects and approved multiple change orders for site and repair work.
- Approved Sealevel invoice for $7,831,628.98
- Awarded Annual Aggregate Materials to Slats Lucas for $1,909,750.00
- Approved Aptim invoice #666604 for $267,186.50
- Awarded surplus sale of 2017 330F Cat Marsh Buggy to Low Land Construction for $151,000.00
- Approved Change Order No. 6 for Lower Dularge Levee West Emergency Repair with Onshore Materials for $310,534.76
- Approved Amendment No. 3 with All South Consulting Engineers for $97,068.81
- Passed Resolution 25-007 granting Substantial Completion to Low Land Construction for Reach J-2 Scour Repair
- Passed Resolution 25-008 granting Substantial Completion to Sealevel Construction for Lower Reach I Levee Lift
Terrebonne Levee and Conservation District
The Terrebonne Levee & Conservation District will consider approving a $7,831,628.98 Sealevel invoice for HNC Lock Complex Phase 2, a $1.9 million annual aggregate materials bid, and several other contracts and change orders for levee and floodgate projects.
- Approval of $7,831,628.98 Sealevel invoice for HNC Lock Complex Phase 2
- Approval of $1,900,750.00 annual aggregate materials bid to Slats Lucas Aggregates
- Sale of 2017 Cat 330F Marsh Buggy to Low Land Construction for $151,000.00
- Change Order No. 6 for Onshore Materials for Lower Dularge Levee West repairs totaling $310,534.76
- Possible closed session to discuss pending litigation including Pontchartrain Partners vs. TLCD
The Board approved the February financial statements and operating and engineering invoices. Two change orders for floodgate and barge gate maintenance were approved to extend contract timelines.
- Approved meeting minutes dated March 12, 2025
- Approved Operating and Engineering invoices
- Approved February Financial Statements
- Approved Change Order No. 1 for Placid and Bush Canal Floodgate Improvements to add 35 days to the contract
- Approved Change Order No. 1 for Pointe-Aux Chene Barge Gate Maintenance Dry Dock for ($53.54) and 5 additional days
Terrebonne Levee and Conservation District
The Terrebonne Levee & Conservation District Board will consider approving operating and engineering invoices, a financial report, and change orders for floodgate improvements. The board may also enter executive session to discuss pending litigation, including cases involving Kathleen Powell and Dewey Aucoin against the State of Louisiana.
- Change Order No. 1 for Sealevel Construction for Placid and Bush Canal Floodgate Improvements adding 35 days
- Change Order No. 1 for Sealevel Construction for Pointe-Aux-Chenes Barge Gate Maintenance Dry Dock for ($53.54) and 5 days
- Potential executive session to discuss litigation: Kathleen Powell et al vs. State of Louisiana, No. 129068
- Potential executive session to discuss litigation: Dewey F. Aucoin and Lisa R. Aucoin vs State of Louisiana, No. 191674
- Potential executive session to discuss litigation: Pontchartrain Partners, LLC vs Terrebonne Levee & Conservation District, No. 0192462
The Board approved several large project payments, including a $7.7M invoice for Sealevel and a $270,419.50 invoice for Aptim. Members also passed the 2025 millage rate and granted project completions for levee rehabilitation and scour repair. Additional approvals were made for maintenance contracts and FEMA-reimbursable services.
- Approved Resolution 25-005 (2025 Millage Rate)
- Approved Sealevel Invoice #23105-8 for $7,706,987.34
- Approved Aptim Invoice #664477 for $270,419.50
- Approved $58,482.52 Sherwin Williams paint quote for Bayou Petite Caillou Barge Gate
- Passed Resolution 25-004 granting Final Acceptance to Construction Site Specialties for Reach G-2-B Rehabilitation Project
- Passed Resolution 25-006 granting Substantial Completion to Sealevel Construction for Hurricane Francine H3 Levee Scour Repair Project
- Approved Amendment No. 8 with Delta Coast Consultants adding $340,000.00 for Hurricane Francine services
- Approved Change Order No. 1 for Allied Shipyard for Bayou Petit Caiilou Floating Barge Gate for $9,870.00
Terrebonne Levee and Conservation District
The Terrebonne Levee & Conservation District will vote on Resolution 25-005 to adopt the 2025 millage rate and consider approval of a $7,706,987.34 Sealevel invoice for the HNC Lock Complex Phase 2. The board will also discuss potential executive session on four pending or potential litigation cases, and consider resolutions for project completion and a $1.5M+ paint quote for the Bayou Petit Caillou Barge Gate.
- Resolution 25-005 — Adopting the 2025 Millage Rate
- Sealevel Invoice #23105-8 (HNC-P2-C008) in the Amount of $7,706,987.34
- Approval of Sherwin Williams Paint Quote for Bayou Petit Caillou Barge Gate in the Amount of $58,482.52
- Discussion and Possible Action to Surplus and Donate sheet piles to TPCG for Hanson Canal Bank Stabilization
- Approval of Amendment No. 8 for Delta Coast Consultants to add $340,000.00 to Hurricane Francine services
The Board approved a cost of living increase for hourly staff and authorized several project payments and contract amendments. They also approved the surplus of a marsh buggy and the purchase of aggregate for Sweet Pond Road.
- Approved 3% cost of living for hourly employees
- Approved surplus of Unit #53 (2017 CAT330F Marsh Buggy) valued at $100,000.00
- Approved 1,150 tons of #610 Aggregate for Sweet Pond Road
- Approved Operating and Engineering invoices
- Approved Financial Report for January 31, 2025
- Approved ratification to open a Regions Checking Account for Grants
- Passed Resolution 25-003 granting Final Acceptance to Sealevel Construction for Bayou Grand Caillou Floating Barge Gate resurfacing
- Approved Change Order No. 1 for Sealevel Construction for TLCD Office Site Improvements Phase 1 for $156,364 and 16 additional days
Terrebonne Levee and Conservation District
The Terrebonne Levee & Conservation District will consider approving a $23,188.36 paint quote for the PAC Barge Gate, declaring Unit #53 (a 2017 CAT330F marsh buggy) as surplus, and hauling 1,800 tons of #610 aggregate to Sweet Water Pond Access Road. The board will also vote on a 3% cost-of-living adjustment for hourly employees, ratify opening a Regions checking account for a grant, and discuss potential litigation in executive session. Additionally, they will consider Resolution 25-003 for final acceptance of the Bayou Grand Caillou Floating Barge Gate resurfacing project and Amendment No. 3 with T. Baker Smith for the Lower Reach I Levee Lift Phase I.
- Approval of Sherwin Williams Paint Quote for the PAC Barge Gate in the Amount of $23,188.36
- Possible Surplus of Unit #53 (2017 CAT330F MARSH BUGGY)
- Approval and Discussion of 1,800 tons of #610 Aggregate to be hauled to Sweet Water Pond Access Road
- Approval of a 3% Cost of Living for Hourly Employees
- Resolution 25-003 to grant Final Acceptance to Sealevel Construction, INC for the TLCD Maintenance Project — Resurfacing of the Bayou Grand Caillou Floating Barge Gate
The Board approved a $3,819,162.78 invoice for Sealevel and various operating and engineering invoices. Two contract increases for Onshore Materials, LLC were approved for levee rehabilitation projects. A no-cost change order for Hurricane Francine yardage reclassification was also passed.
- Approved Sealevel invoice for $3,819,162.78
- Approved Operating and Engineering invoices
- Approved no-cost Change Order No. 13 for Onshore Materials, LLC (Hurricane Francine yardage)
- Approved Change Order No. 1 for Onshore Materials, LLC: $212,500 increase and 250 additional days for Lower Dularge East Levee Rehabilitation Phase 3B
- Approved Change Order No. 7 for Onshore Materials, LLC: $1,398,750 increase and 250 additional days for Reach E Rehabilitation Segment No. 1 and Segment No. 2
- Approved meeting minutes from January 29, 2025
Terrebonne Levee and Conservation District
The Terrebonne Levee and Conservation District will consider approving a $3,819,162.78 invoice for the HNC Lock Complex Phase 2 and two change orders totaling $1,611,152.74 for levee rehabilitation projects. The board may also enter executive session to discuss pending litigation. This meeting is a regular public meeting with decisions on contracts and project updates.
- HNC Lock Complex Phase 2 invoice from Sealevel for $3,819,162.78
- Change Order No. 1 for Lower Dularge East Levee Rehabilitation Phase 3-B: $212,500.00
- Change Order No. 7 for Reach E Rehabilitation: $1,398,652.74
- Executive session to discuss four pending lawsuits including Powell, Aucoin, and Pontchartrain Partners cases
- Project updates on Bayou Black emergency levee repairs, Reach B levee lift, and Wine Island restoration
The Board approved several levee project change orders and emergency repair contracts. It also authorized payments for APTIM and engineering invoices and approved the December 2024 financial report.
- Awarded Reach J-3 Hurricane Francine Emergency Scour Repair Project to Low Land Construction, INC for $1,058,424.00
- Approved APTIM invoice for $212,233.75
- Approved Final Balancing Change Order No. 3 for Reach G-2 Levee Rehabilitation — Segment B for ($149,409.07)
- Approved Amendment No. 6 with All South Consulting Engineers, LLC for Lower Dularge East Levee Phase 3 Improvements for $48,000.00
- Approved Change Order No. 5 for Onshore Materials, LLC adding 120 days and $33,824.98
- Approved Change Order No. 4 for Low Land Construction for Emergency Services Contract (2024 Hurricane Season) for $106,910.38
- Approved Change Order No. 1 for Sealevel Construction, LLC adding 45 weather days for Reach H3 repair
- Approved Change Order No. 2 for Low Land Construction Company adding 46 weather days for Reach J-2 repair
Terrebonne Levee and Conservation District
The Terrebonne Levee and Conservation District will review several levee rehabilitation projects and engineering amendments. The agenda includes reviewing invoices for the HNC Lock Complex and discussing pending litigation in executive session.
- Recommendation of award to Low Land Construction Company, INC for $1,058,424.00 for Reach J-3 Hurricane Francine Emergency Scour Repair
- APTIM invoice for HNC Lock Complex Phase 2 in the amount of $212,233.75
- Approval of Amendment No. 6 with All South Consulting Engineers, LLC for $48,000.00 regarding Lower Dularge East Levee Phase 3
- Final Balancing Change Order No. 3 for Reach G-2 Levee Rehabilitation in the amount of ($149,409.07)
- Change Order No. 4 for Onshore Materials, LLC Emergency Services Contract in the amount of $106,910.38
The Board approved several large invoices, including $6.5M for Sealevel and $231,064.25 for APTIM. Members passed resolutions for project acceptance, state treasury agreements, and intergovernmental data sharing. The Board also approved two contract change orders for time and labor repairs.
- Approved Sealevel #23105-6 invoice for $6,501,743.71
- Approved APTIM invoice for $231,064.25
- Approved Operating and Engineering invoices
- Passed Resolution 25-001 for Partial Final Acceptance for Onshore Materials, LLC (Reach E)
- Passed Resolution 25-002 to authorize signing CEA Act 170 Agreement with State Dept. of Treasury
- Adopted Subrecipient Programmatic Policies and Procedures for Houma Navigational Lock Complex
- Approved IGA with South Lafourche District for water monitoring equipment data sharing
- Approved $19,430 change order for Construction Specialties, LLC for Reach G-2 levee repairs
Terrebonne Levee and Conservation District
The Terrebonne Levee and Conservation District will review project updates and financial matters. The body is considering several invoices for the Houma Navigational Canal Lock Complex and discussing potential litigation and intergovernmental agreements.
- Sealevel invoice for $6,501,743.71 (HNC Lock Complex Phase 2)
- APTIM invoice for $231,064.25 (HNC Lock Complex Phase 2)
- Construction Site Specialties, LLC change order for $19,430.00 for Reach G-2 levee repairs
- Proposed programmatic policies for the Houma Navigational Canal Lock Complex Project
- Intergovernmental Agreement with South Lafourche Levee District for water monitoring equipment
The Board approved several levee improvement contracts and change orders, including a major award for emergency repairs. They also authorized the advertisement of two new levee and bridge projects. Financial reports and various project invoices were approved.
- Approved $2,946,980.00 award to Sealevel Construction for Reach J-2 Hurricane Francine Emergency Repair
- Approved $1,390,121.60 Change Order No. 5 for Sealevel Construction for materials
- Approved $1,110,000.00 Change Order No. 5 for Reach J-2/J-3 Levee Segment (contingent on Lafourche Parish funding)
- Approved $495,000.00 Change Order No. 7 for Morganza to the Gulf Reach J-3 (contingent on Lafourche Parish funding)
- Authorized advertisement for Reach L Floodwall and Access Bridge
- Authorized advertisement for Reach H2 & H3 Levee Lift to elevation +15.0’
- Approved $77,500.00 invoice for Chef Menteur Pass Mitigation
- Approved Final Balancing Change Order No. 17 ($71,731.33) and No. 20 ($47,627.29) for Low Land Construction